Bid analysis using ACCEST

By: Call Number: AIT Thesis no.ST-01-33 Contributor(s): Material type: SeriesSeries: Asian Institute of Technology. Thesis ; no. ST-01-33Publication details: Bangkok : Asian Institute of Technology, 2001Description: 146 leavesSubject(s): Online resources: Dissertation note: Thesis (M.Eng.) - Asian Institute of Technology, 2001 Summary: The dominant current bid evaluation practice is to use the lowest bid as the sole criterion for contractor selection, especially in public work due to preference to avoid controversy and public responsibility. Adverse effects include insolvency of contractor, poor workmanship, and extensive claims. The existing design cost analyzer software: "WinACCEST 99 Plus", is modified due to potential and applicability of the software structure, using MS Visual Basics 6.0 and MS Access 97, to provide various analyses. The analyses are based on "Bid Variation Indicator" or BVI: quantitative values, which are both statistical and non-statistical. The modified software is used to analyze bidding data from a real project. The results are further analyzed qualitatively. Suggestions for usage of BVI are provided. The modified software can provide quantitative values to support managerial decisions in the bid evaluation process. Several minor improvements are accomplished: such as data input from spreadsheets, more data types; incorporation and separation into cost elements with general overhead, contingency, and profit; etc. Furthermore, as existing features are maintained, the software can provide analysis on accuracy of design estimates to help facilitate learning from experience of design estimators and to improve the performance of design estimates.
Tags from this library: No tags from this library for this title. Log in to add tags.
Star ratings
    Average rating: 0.0 (0 votes)
Holdings
Cover image Item type Current library Home library Collection Shelving location Call number Materials specified Vol info URL Copy number Status Notes Date due Barcode Item holds Item hold queue priority Course reserves
22-AIT Thesis (Replacement) Asian Institute of Technology Library AIT Publications AIT Thesis no.ST-01-33 (Browse shelf(Opens below)) 3 Available 30050120746044
40-Archives Asian Institute of Technology Library Archives AIT Thesis no.ST-01-33 (Browse shelf(Opens below)) 1 Available 30050160067301
20-AIT Publication Asian Institute of Technology Library AIT Publications AIT Thesis no.ST-01-33 (Browse shelf(Opens below)) 1 Available 30050121002462

A thesis submitted in partial fulfillment of the requirements for the degree of Master of Engineering, School of Civil Engineering

Thesis (M.Eng.) - Asian Institute of Technology, 2001

The dominant current bid evaluation practice is to use the lowest bid as the sole criterion for contractor selection, especially in public work due to preference to avoid controversy and public responsibility. Adverse effects include insolvency of contractor, poor workmanship, and extensive claims. The existing design cost analyzer software: "WinACCEST 99 Plus", is modified due to potential and applicability of the software structure, using MS Visual Basics 6.0 and MS Access 97, to provide various analyses. The analyses are based on "Bid Variation Indicator" or BVI: quantitative values, which are both statistical and non-statistical. The modified software is used to analyze bidding data from a real project. The results are further analyzed qualitatively. Suggestions for usage of BVI are provided. The modified software can provide quantitative values to support managerial decisions in the bid evaluation process. Several minor improvements are accomplished: such as data input from spreadsheets, more data types; incorporation and separation into cost elements with general overhead, contingency, and profit; etc. Furthermore, as existing features are maintained, the software can provide analysis on accuracy of design estimates to help facilitate learning from experience of design estimators and to improve the performance of design estimates.

There are no comments on this title.

to post a comment.
คัดลอกแล้ว!