Uses of mini-piles and micro-piles in foundation works
Call Number: AIT Thesis no.GT-81-02 Series: Asian Institute of Technology. Thesis ; no. GT-81-02Publication details: Bangkok : Asian Institute of Technology, 1982Description: 131 pSubject(s): Online resources: Dissertation note: Thesis (M.Eng.) - Asian Institute of Technology, 1982 Summary: This thesis deal with (1) constructions oi micro piles in Dot h 11on-displac went and displacement methods (2) load testing the construct d piles to see the behavior of these pile (3) comparison of the actual behavior with the predicted behavior determined by the conventional method. Four micro piles were constructed for testing purposes. All of the piles had the same diameter of 100 mm. Two of them of 17.50 m. length were constructed by the non-displacement method. The other two of 13.85 and 15.00 m. length were constructed by the displacement method. In both methods, one was constructed by the displacement method. In both methods, one was grouted only in the FIRST step, the other was grouted both in the FIRST and SECOND steps. The slow maintained loading tests were carried out after 21 days of pile installing. All piles were tested to failure. From the load test results, it showed that the behavior of the micro piles constructed either by the non-displacement or by the displacement method gave the same results. From the load-settlement relationship, the SECOND step grouting micro piles showed that the pile failed by the yielding of the micro pile tube itself. If the micro pile tube was strong enough to carry the higher load, the failure load would be higher than the actual one. For this reason, the bearing capacity of the micro pile could be improved by the SECOND step grouting.| Cover image | Item type | Current library | Home library | Collection | Shelving location | Call number | Materials specified | Vol info | URL | Copy number | Status | Notes | Date due | Barcode | Item holds | Item hold queue priority | Course reserves | |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
20-AIT Publication
|
Asian Institute of Technology Library AIT Publications | AIT Thesis no.GT-81-02 (Browse shelf(Opens below)) | 1 | Available | 30050003010203 | |||||||||||||
20-AIT Publication
|
Asian Institute of Technology Library AIT Publications | AIT Thesis no.GT-81-02 (Browse shelf(Opens below)) | 2 | Available | 30050003010211 | |||||||||||||
40-Archives
|
Asian Institute of Technology Library Archives | AIT Thesis no.GT-81-02 (Browse shelf(Opens below)) | 1 | Available | 30050160070388 | |||||||||||||
20-AIT Publication
|
Asian Institute of Technology Library Archives | AIT Thesis no.GT-81-02 (Browse shelf(Opens below)) | 3 | Available | 30050120934343 |
A thesis submitted in partial fulfillment of the requirements for the degree of Master of Engineering, School of Engineering and Technology
Thesis (M.Eng.) - Asian Institute of Technology, 1982
This thesis deal with (1) constructions oi micro piles in Dot h 11on-displac went and displacement methods (2) load testing the construct d piles to see the behavior of these pile (3) comparison of the actual behavior with the predicted behavior determined by the conventional method. Four micro piles were constructed for testing purposes. All of the piles had the same diameter of 100 mm. Two of them of 17.50 m. length were constructed by the non-displacement method. The other two of 13.85 and 15.00 m. length were constructed by the displacement method. In both methods, one was constructed by the displacement method. In both methods, one was grouted only in the FIRST step, the other was grouted both in the FIRST and SECOND steps. The slow maintained loading tests were carried out after 21 days of pile installing. All piles were tested to failure. From the load test results, it showed that the behavior of the micro piles constructed either by the non-displacement or by the displacement method gave the same results. From the load-settlement relationship, the SECOND step grouting micro piles showed that the pile failed by the yielding of the micro pile tube itself. If the micro pile tube was strong enough to carry the higher load, the failure load would be higher than the actual one. For this reason, the bearing capacity of the micro pile could be improved by the SECOND step grouting.
There are no comments on this title.

AI Search