A business model for decommissioning of fixed jacket platforms

By: Call Number: AIT Thesis no.OTM-15-04 Contributor(s): Material type: SeriesSeries: Asian Institute of Technology. Thesis ; no. OTM-15-04Publication details: Pathum Thani, Thailand : Asian Institute of Technology, 2015Description: 1 online resource (85 leaves) : ill. (some col.)Subject(s): Online resources: Dissertation note: Thesis (M.Eng.) - Asian Institute of Technology, 2015 Summary: Decommissioning is a process of dismantling an installed structure and taking everything out of the site. The oil and gas industry especially the offshore industry is now moving towards deeper water and most of the shallow water installations may become idle as the most of the shallow water fields are coming closer to the end of their field life. Now the concern is on how to deal with the platforms that are about to cease the productions in the near future.Thethesis focussesto understand the process of decommissioning.While doing soit talks about the regulation and guidelines available across the world and in Thailand for decommissioning the fixed offshore structures with specific focus on steel fixed jacketed platforms. This document will also talk about the options available in decommissioning and financial and non-financial benefit associated with it from the operator point of view. From the point of view of the contractor for execution of decommissioning, the thesis focuses on building a business model for the decommissioning of oil and gas platforms. In this thesis the cost drivers in the processof decommissioning were found outand then listed. The cost drivers are necessary to build a cash flow model to understand the feasibility of the business. Different types of cash flow models are made and financial criteria are placed up-front to carry out the feasibility analysis for looking the project as a new businessexpanded by an existing fabrication contracting company. The results are drawn and the conclusions are presented. The analyses havecertain limitations and it provides the scope for other persons to carry out a further study in the future.
Tags from this library: No tags from this library for this title. Log in to add tags.
Star ratings
    Average rating: 0.0 (0 votes)
Holdings
Cover image Item type Current library Home library Collection Shelving location Call number Materials specified Vol info URL Copy number Status Notes Date due Barcode Item holds Item hold queue priority Course reserves
20-AIT Publication Asian Institute of Technology Library AIT Publications AIT Thesis no.OTM-15-04 (Browse shelf(Opens below)) 1 Available 30050120326789
20-AIT Publication Asian Institute of Technology Library AIT Publications AIT Thesis no.OTM-15-04 (Browse shelf(Opens below)) 2 Available 30050120326581
40-Archives Asian Institute of Technology Library Archives AIT Thesis no.OTM-15-04 (Browse shelf(Opens below)) 1 Available 30050120401376

A thesis submitted in partial fulfillment of the requirements for the degree of Master of Engineering in Offshore Technology and Management, School of Engineering and Technology

Thesis (M.Eng.) - Asian Institute of Technology, 2015

Decommissioning is a process of dismantling an installed structure and taking everything out of the site. The oil and gas industry especially the offshore industry is now moving towards deeper water and most of the shallow water installations may become idle as the most of the shallow water fields are coming closer to the end of their field life. Now the concern is on how to deal with the platforms that are about to cease the productions in the near future.Thethesis focussesto understand the process of decommissioning.While doing soit talks about the regulation and guidelines available across the world and in Thailand for decommissioning the fixed offshore structures with specific focus on steel fixed jacketed platforms. This document will also talk about the options available in decommissioning and financial and non-financial benefit associated with it from the operator point of view. From the point of view of the contractor for execution of decommissioning, the thesis focuses on building a business model for the decommissioning of oil and gas platforms. In this thesis the cost drivers in the processof decommissioning were found outand then listed. The cost drivers are necessary to build a cash flow model to understand the feasibility of the business. Different types of cash flow models are made and financial criteria are placed up-front to carry out the feasibility analysis for looking the project as a new businessexpanded by an existing fabrication contracting company. The results are drawn and the conclusions are presented. The analyses havecertain limitations and it provides the scope for other persons to carry out a further study in the future.

There are no comments on this title.

to post a comment.
คัดลอกแล้ว!