Comparison of methods of priority ranking of a road network in Thailand

By: Call Number: AIT Thesis no. GT-80-22 Contributor(s): Material type: TextLanguage: EN Series: Asian Institute of Technology. Thesis ; no. GT-80-22Publication details: Bangkok : Asian Institute of Technology, 1981Description: iv, 100 pSubject(s): Online resources: Summary: The study deals with determining a program for road construction projects and selecting among various alternatives under budget constraint. The study aimed to show which oþ the existing methods is more reliable and efficient and Suggested approaches to priority ranking of projects. Four methods: ( 1) internal rate of return; (2) net present value; (3) incremental benefit/cost ratio; and (4 ) net present value/investment ratio were considered. In addition, the problem was expressed in mathematical form and an optimization program was applied. Comparisons were made primarily on the basis of maximum return on invested capital as measured by the net present value, and on the optimization technique. Secondary comparisons were made on the basis of total investment, the total number of projects included, and the total kilometers of road to be constructed. Different levels of capital investment were tried to determine any changes in the findings. The results indicated that optimization model would generally provide the greatest return for any amount of capital expenditure. The question of whether second best, third best or worse alternatives would have a chance of inclusion in the optimum highway improvement program was also investigated.
Tags from this library: No tags from this library for this title. Log in to add tags.
Star ratings
    Average rating: 0.0 (0 votes)
Holdings
Cover image Item type Current library Home library Collection Shelving location Call number Materials specified Vol info URL Copy number Status Notes Date due Barcode Item holds Item hold queue priority Course reserves
20-AIT Publication Asian Institute of Technology Library AIT Publications AIT Thesis no. GT-80-22 (Browse shelf(Opens below)) 1 Available 30050003049904
20-AIT Publication Asian Institute of Technology Library AIT Publications AIT Thesis no. GT-80-22 (Browse shelf(Opens below)) 2 Available 30050003049912
40-Archives Asian Institute of Technology Library Archives AIT Thesis no. GT-80-22 (Browse shelf(Opens below)) 1 Available 30050160070537

A thesis submitted in partial fulfilment of the requirements for the degree of Master of Engineering, School of Engineering and Technology

Thesis (M. Eng.) - Asian Institute of Technology, 1981

The study deals with determining a program for road construction projects and selecting among various alternatives under budget constraint. The study aimed to show which oþ the existing methods is more reliable and efficient and Suggested approaches to priority ranking of projects. Four methods: ( 1) internal rate of return; (2) net present value; (3) incremental benefit/cost ratio; and (4 ) net present value/investment ratio were considered. In addition, the problem was expressed in mathematical form and an optimization program was applied. Comparisons were made primarily on the basis of maximum return on invested capital as measured by the net present value, and on the optimization technique. Secondary comparisons were made on the basis of total investment, the total number of projects included, and the total kilometers of road to be constructed. Different levels of capital investment were tried to determine any changes in the findings. The results indicated that optimization model would generally provide the greatest return for any amount of capital expenditure. The question of whether second best, third best or worse alternatives would have a chance of inclusion in the optimum highway improvement program was also investigated.