Competitiveness of various floor systems in Thailand
Call Number: AIT Thesis no. ST-85-19 Material type:
TextSeries: Asian Institute of Technology. Thesis ; no. ST-85-19Publication details: Bangkok : Asian Institute of Technology, 1985Description: 113 pSubject(s): Online resources: Dissertation note: Thesis (M.Eng.) - Asian Institute of Technology, 1985 Summary: A Guide to compare the competitiveness of three various floor systems used in Thailand; i.e., precast concrete slab on reinforced concrete beams, precast concrete slab on steel beams, and post-tensioned flat plates is proposed in the study. In addition, another floor system; i.e., the composite steel deck slab, which is widely used in U.S.A., is also considered to see its potential for application in Thailand. Investigation of each follr system has been made on 4 selected span lengths of 6.00, 8.00, 10.00 and 12.00m. with 3 different specified live loads of 200, 300 and 400 kg/m2, respectively, with additional constant supperimposede dead load of 100 kg/m2 for each live load case. Consideration of cost, weight, required depth, construction time and process has been accounted for. From this study, various comparison about cost per unit area, weight per unit area, required depth, and construction time of each floor system can be made. Varying live load cases are proved to have no effect on the comparative trends of cost, weight, and depth between each system with the same length. Only varying span lengths have effects on such trends, which are presented in detalis herein. The construction time required for 3 floor systems; i.e. the precast concrete slab with steel beams, the post-tensioned float plate, and the composite steel deck slab, is 6 day, whereas that for the precast concrete slab with reinforced concrete beam is 9 days.
| Cover image | Item type | Current library | Home library | Collection | Shelving location | Call number | Materials specified | Vol info | URL | Copy number | Status | Notes | Date due | Barcode | Item holds | Item hold queue priority | Course reserves | |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
20-AIT Publication
|
Asian Institute of Technology Library AIT Publications | AIT Thesis no. ST-85-19 (Browse shelf(Opens below)) | 1 | Available | 30050003061875 | |||||||||||||
20-AIT Publication
|
Asian Institute of Technology Library AIT Publications | AIT Thesis no. ST-85-19 (Browse shelf(Opens below)) | 2 | Available | 30050003061867 | |||||||||||||
40-Archives
|
Asian Institute of Technology Library Archives | AIT Thesis no. ST-85-19 (Browse shelf(Opens below)) | 1 | Available | 30050160012547 |
A thesis submitted in partial fulfillment of the requirements for the degree of Master of Engineering, School of Engineering and Technology
Thesis (M.Eng.) - Asian Institute of Technology, 1985
A Guide to compare the competitiveness of three various floor systems used in Thailand; i.e., precast concrete slab on reinforced concrete beams, precast concrete slab on steel beams, and post-tensioned flat plates is proposed in the study. In addition, another floor system; i.e., the composite steel deck slab, which is widely used in U.S.A., is also considered to see its potential for application in Thailand. Investigation of each follr system has been made on 4 selected span lengths of 6.00, 8.00, 10.00 and 12.00m. with 3 different specified live loads of 200, 300 and 400 kg/m2, respectively, with additional constant supperimposede dead load of 100 kg/m2 for each live load case. Consideration of cost, weight, required depth, construction time and process has been accounted for. From this study, various comparison about cost per unit area, weight per unit area, required depth, and construction time of each floor system can be made. Varying live load cases are proved to have no effect on the comparative trends of cost, weight, and depth between each system with the same length. Only varying span lengths have effects on such trends, which are presented in detalis herein. The construction time required for 3 floor systems; i.e. the precast concrete slab with steel beams, the post-tensioned float plate, and the composite steel deck slab, is 6 day, whereas that for the precast concrete slab with reinforced concrete beam is 9 days.
There are no comments on this title.

AI Search