Compression of network with activity on the nodes
Call Number: AIT Thesis no. 957 Material type:
TextSeries: Asian Institute of Technology. Thesis ; no. 957Publication details: Bangkok : Asian Institute of Technology, 1976Description: 33 pSubject(s): Online resources: Dissertation note: Thesis (M.Eng.) - Asian Institute of Technology, 1976 Summary: An algorithm is developed to reduce the duration of the project, which is represented in a form of precedence critical path network, by compressing the durations of selected activities in such a way that the increase in total project cost is minimum. Proposing a structural model comprising of columns and plates which represent the activities in the network, the compression of the network is equivalent to the compression of the structural model. A computer program is developed to carry out the compression algorithm.
| Cover image | Item type | Current library | Home library | Collection | Shelving location | Call number | Materials specified | Vol info | URL | Copy number | Status | Notes | Date due | Barcode | Item holds | Item hold queue priority | Course reserves | |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
20-AIT Publication
|
Asian Institute of Technology Library AIT Publications | AIT Thesis no. 957 (Browse shelf(Opens below)) | 1 | Available | 30050003039012 | |||||||||||||
20-AIT Publication
|
Asian Institute of Technology Library AIT Publications | AIT Thesis no. 957 (Browse shelf(Opens below)) | 2 | Available | 30050003039046 | |||||||||||||
40-Archives
|
Asian Institute of Technology Library Archives | AIT Thesis no. 957 (Browse shelf(Opens below)) | Available | 30050160091442 |
A thesis submitted in partial fulfillment of the requirements for the degree of Master of Engineering of the Asian Institute of Technology, Bangkok, Thailand
Thesis (M.Eng.) - Asian Institute of Technology, 1976
An algorithm is developed to reduce the duration of the project, which is represented in a form of precedence critical path network, by compressing the durations of selected activities in such a way that the increase in total project cost is minimum. Proposing a structural model comprising of columns and plates which represent the activities in the network, the compression of the network is equivalent to the compression of the structural model. A computer program is developed to carry out the compression algorithm.