Compression of network with activity on the nodes

By: Call Number: AIT Thesis no. 957 Contributor(s): Material type: TextSeries: Asian Institute of Technology. Thesis ; no. 957Publication details: Bangkok : Asian Institute of Technology, 1976Description: 33 pSubject(s): Online resources: Dissertation note: Thesis (M.Eng.) - Asian Institute of Technology, 1976 Summary: An algorithm is developed to reduce the duration of the project, which is represented in a form of precedence critical path network, by compressing the durations of selected activities in such a way that the increase in total project cost is minimum. Proposing a structural model comprising of columns and plates which represent the activities in the network, the compression of the network is equivalent to the compression of the structural model. A computer program is developed to carry out the compression algorithm.
Tags from this library: No tags from this library for this title. Log in to add tags.
Star ratings
    Average rating: 0.0 (0 votes)
Holdings
Cover image Item type Current library Home library Collection Shelving location Call number Materials specified Vol info URL Copy number Status Notes Date due Barcode Item holds Item hold queue priority Course reserves
20-AIT Publication Asian Institute of Technology Library AIT Publications AIT Thesis no. 957 (Browse shelf(Opens below)) 1 Available 30050003039012
20-AIT Publication Asian Institute of Technology Library AIT Publications AIT Thesis no. 957 (Browse shelf(Opens below)) 2 Available 30050003039046
40-Archives Asian Institute of Technology Library Archives AIT Thesis no. 957 (Browse shelf(Opens below)) Available 30050160091442

A thesis submitted in partial fulfillment of the requirements for the degree of Master of Engineering of the Asian Institute of Technology, Bangkok, Thailand

Thesis (M.Eng.) - Asian Institute of Technology, 1976

An algorithm is developed to reduce the duration of the project, which is represented in a form of precedence critical path network, by compressing the durations of selected activities in such a way that the increase in total project cost is minimum. Proposing a structural model comprising of columns and plates which represent the activities in the network, the compression of the network is equivalent to the compression of the structural model. A computer program is developed to carry out the compression algorithm.