Computer aided optimal network analysis
Call Number: AIT Thesis no. ST-85-02 Material type:
TextSeries: Asian Institute of Technology. Thesis ; no. ST-85-02Publication details: Bangkok : Asian Institute of Technology, 1985Description: 117 pSubject(s): Online resources: Dissertation note: Thesis (M.Eng.) - Asian Institute of Technology, 1985 Summary: The available optimization algorithms for critical path computations, the time-cost tradeoff analysis and the resource levelling problem are expended to a more realistic overlapping precedence network. The method of analysis for optimizing the network technique involves the use of a Linear Programming Model and a least Squares Method for the time-cost tradeoff and the resource levelling problems respectively. A complete computer program is developed from the combination of the extended algorithms and linear programming models. The program is capable of providing any type of network based information whenever needed, prior to or during the construction operation. The Solution satisfies the requirement that the project be completed within a fixed project completion time and is optimal in terms of cost. The newly developed computer program for the optimal network analysis requires information on network details, cost-duration charts, types of resources and the work content of every activity in terms of resource-days for the project.
| Cover image | Item type | Current library | Home library | Collection | Shelving location | Call number | Materials specified | Vol info | URL | Copy number | Status | Notes | Date due | Barcode | Item holds | Item hold queue priority | Course reserves | |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
20-AIT Publication
|
Asian Institute of Technology Library AIT Publications | AIT Thesis no. ST-85-02 (Browse shelf(Opens below)) | 1 | Available | 30050003061545 | |||||||||||||
20-AIT Publication
|
Asian Institute of Technology Library AIT Publications | AIT Thesis no. ST-85-02 (Browse shelf(Opens below)) | 2 | Available | 30050003061537 | |||||||||||||
40-Archives
|
Asian Institute of Technology Library Archives | AIT Thesis no. ST-85-02 (Browse shelf(Opens below)) | 1 | Available | 30050160012711 |
A thesis submitted in partial fulfillment of the requirements for the degree of Master of Engineering, School of Engineering and Technology
Thesis (M.Eng.) - Asian Institute of Technology, 1985
The available optimization algorithms for critical path computations, the time-cost tradeoff analysis and the resource levelling problem are expended to a more realistic overlapping precedence network. The method of analysis for optimizing the network technique involves the use of a Linear Programming Model and a least Squares Method for the time-cost tradeoff and the resource levelling problems respectively. A complete computer program is developed from the combination of the extended algorithms and linear programming models. The program is capable of providing any type of network based information whenever needed, prior to or during the construction operation. The Solution satisfies the requirement that the project be completed within a fixed project completion time and is optimal in terms of cost. The newly developed computer program for the optimal network analysis requires information on network details, cost-duration charts, types of resources and the work content of every activity in terms of resource-days for the project.
There are no comments on this title.

AI Search