Computer-aided software project scheduler
Call Number: AIT RSPR no. CS-88-9 Material type:
SeriesSeries: Asian Institute of Technology. Research studies project report ; no. CS-88-9Publication details: Bangkok : Asian Institute of Technology, 1988Description: 82 pSubject(s): Online resources: Dissertation note: Research Studies Project Report (M. Eng.) - Asian Institute of Technology, 1988 Summary: This research study deals with t he essential information needed in the manpower planning of a software project . The Cost Constructive Model is used as a basis for estimating the software development schedule. The system relies on t he expertise of the project manager to determine the project requirements for a specific software project. Information is organized using the instantiation concept in frame representation and is coupled with an inference engine which embodies the scheduling strategy. The least commitment principle is us e d to determine priorities in project tasks thus avoiding premature decisions in task scheduling. The implemented portion of the design utilizes pre-determined information such as task precedence, task duration, and project staffing requirements that are manipulated in detecting and resolving conflicts that arise in scheduling a software project.
| Cover image | Item type | Current library | Home library | Collection | Shelving location | Call number | Materials specified | Vol info | URL | Copy number | Status | Notes | Date due | Barcode | Item holds | Item hold queue priority | Course reserves | |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
22-AIT Thesis (Replacement)
|
Asian Institute of Technology Library AIT Publications | AIT RSPR no. CS-88-9 (Browse shelf(Opens below)) | 3 | Available | 30050120616650 | |||||||||||||
40-Archives
|
Asian Institute of Technology Library Archives | AIT RSPR no. CS-88-9 (Browse shelf(Opens below)) | Available | 30050120238745 |
A research study submitted in partial fulfillment of the requirements for the degree of Master of Science, School of Engineering and Technology
Research Studies Project Report (M. Eng.) - Asian Institute of Technology, 1988
This research study deals with t he essential information needed in the manpower planning of a software project . The Cost Constructive Model is used as a basis for estimating the software development schedule. The system relies on t he expertise of the project manager to determine the project requirements for a specific software project. Information is organized using the instantiation concept in frame representation and is coupled with an inference engine which embodies the scheduling strategy. The least commitment principle is us e d to determine priorities in project tasks thus avoiding premature decisions in task scheduling. The implemented portion of the design utilizes pre-determined information such as task precedence, task duration, and project staffing requirements that are manipulated in detecting and resolving conflicts that arise in scheduling a software project.
There are no comments on this title.

AI Search