Computer-aided software project scheduler

By: Call Number: AIT RSPR no. CS-88-9 Contributor(s): Material type: SeriesSeries: Asian Institute of Technology. Research studies project report ; no. CS-88-9Publication details: Bangkok : Asian Institute of Technology, 1988Description: 82 pSubject(s): Online resources: Dissertation note: Research Studies Project Report (M. Eng.) - Asian Institute of Technology, 1988 Summary: This research study deals with t he essential information needed in the manpower planning of a software project . The Cost Constructive Model is used as a basis for estimating the software development schedule. The system relies on t he expertise of the project manager to determine the project requirements for a specific software project. Information is organized using the instantiation concept in frame representation and is coupled with an inference engine which embodies the scheduling strategy. The least commitment principle is us e d to determine priorities in project tasks thus avoiding premature decisions in task scheduling. The implemented portion of the design utilizes pre-determined information such as task precedence, task duration, and project staffing requirements that are manipulated in detecting and resolving conflicts that arise in scheduling a software project.
Tags from this library: No tags from this library for this title. Log in to add tags.
Star ratings
    Average rating: 0.0 (0 votes)
Holdings
Cover image Item type Current library Home library Collection Shelving location Call number Materials specified Vol info URL Copy number Status Notes Date due Barcode Item holds Item hold queue priority Course reserves
22-AIT Thesis (Replacement) Asian Institute of Technology Library AIT Publications AIT RSPR no. CS-88-9 (Browse shelf(Opens below)) 3 Available 30050120616650
40-Archives Asian Institute of Technology Library Archives AIT RSPR no. CS-88-9 (Browse shelf(Opens below)) Available 30050120238745

A research study submitted in partial fulfillment of the requirements for the degree of Master of Science, School of Engineering and Technology

Research Studies Project Report (M. Eng.) - Asian Institute of Technology, 1988

This research study deals with t he essential information needed in the manpower planning of a software project . The Cost Constructive Model is used as a basis for estimating the software development schedule. The system relies on t he expertise of the project manager to determine the project requirements for a specific software project. Information is organized using the instantiation concept in frame representation and is coupled with an inference engine which embodies the scheduling strategy. The least commitment principle is us e d to determine priorities in project tasks thus avoiding premature decisions in task scheduling. The implemented portion of the design utilizes pre-determined information such as task precedence, task duration, and project staffing requirements that are manipulated in detecting and resolving conflicts that arise in scheduling a software project.

There are no comments on this title.

to post a comment.
คัดลอกแล้ว!