Construction engineering and management of concrete work in hydropower RCC dam project : a case study of 'Yeywa Hydropower Roller Compacted Concrete Dam Construction Project'

By: Call Number: AIT Proj. no.MPM-MM-CM-17-07 Contributor(s): Material type: SeriesSeries: Asian Institute of Technology. Project ; no. MPM-MM-CM-17-07Publication details: Pathum Thani, Thailand : Asian Institute of Technology, 2017Description: 112 p. : illSubject(s): Dissertation note: Project (M. Eng.) - Asian Institute of Technology, 2017 Summary: Since Myanmar is enriched with hydropower resources, sustainable hydropower development will be long term solution for cheaper price and greener energy. Construction of hydropower dams for Myanmar is important sector to solve power requirement problems. A case study of Yeywa hydropower project Roller Compacted Concrete dam construction management was the one important construction work in Myanmar and got various studies and new technologies of roller compacted concrete dam construction management for Myanmar engineers. (790)MW Yeywa hydropower project was the first RCC dam construction proj ect in Myanmar and the largest mass amount of concrete (2.5) million m ' of RCC concrete and (1.1 )million rrr' CVC concrete used.- it was built with (5) steps of construction method and occurred many problems during RCC dam construction duration. Among them, segregation problems and batching plant & placement problems occurred mostly. Preventions in all steps made systematically according to consultant guide line. Improvement of quality control checks also done by contractors and owner (DHPI) in all steps.
Tags from this library: No tags from this library for this title. Log in to add tags.
Star ratings
    Average rating: 0.0 (0 votes)
Holdings
Cover image Item type Current library Home library Collection Shelving location Call number Materials specified Vol info URL Copy number Status Notes Date due Barcode Item holds Item hold queue priority Course reserves
20-AIT Publication Asian Institute of Technology Library AIT Publications AIT Proj. no.MPM-MM-CM-17-07 (Browse shelf(Opens below)) 1 Available 30050120981930
20-AIT Publication Asian Institute of Technology Library AIT Publications AIT Proj. no.MPM-MM-CM-17-07 (Browse shelf(Opens below)) 2 Available 30050120981922

A project submitted in partial fulfillment of the requirements for the degree of Master of Engineering (Professional) in Construction, Engineering and Infrastructure Management

Project (M. Eng.) - Asian Institute of Technology, 2017

Since Myanmar is enriched with hydropower resources, sustainable hydropower development will be long term solution for cheaper price and greener energy. Construction of hydropower dams for Myanmar is important sector to solve power requirement problems. A case study of Yeywa hydropower project Roller Compacted Concrete dam construction management was the one important construction work in Myanmar and got various studies and new technologies of roller compacted concrete dam construction management for Myanmar engineers. (790)MW Yeywa hydropower project was the first RCC dam construction proj ect in Myanmar and the largest mass amount of concrete (2.5) million m ' of RCC concrete and (1.1 )million rrr' CVC concrete used.- it was built with (5) steps of construction method and occurred many problems during RCC dam construction duration. Among them, segregation problems and batching plant & placement problems occurred mostly. Preventions in all steps made systematically according to consultant guide line. Improvement of quality control checks also done by contractors and owner (DHPI) in all steps.