Construction management of Khao Laem Dam project

By: Call Number: AIT Thesis no.ST-83-08 Contributor(s): Material type: TextSeries: Asian Institute of Technology. Thesis ; no. ST-83-08Publication details: Bangkok : Asian Institute of Technology, 1983Description: v, 84 pSubject(s): Online resources: Dissertation note: Thesis (M.Eng.) - Asian Institute of Technology, 1983 Summary: In this study , the existing construction management for progress control , materials, manpower and equipment at the Khao Laem Dam project has been discussed . A computer analysis for manpower allocation has been carried out. Furthermore , a proposed model. for d am construction management has been presented . Field data and information for the project were collected. According the the collected data, the management of this project seems to have insufficient manpower but too old plant machinery. Nevertheless, the delivery and procurement of materials are very sound. It is found by a computer analysis that the distribution of resources for saving manpower are easily identified. For future use. a management model is developed which could be applied to similar projects. It is apparent from this study that computer application is an essential component in complex construction management.
Tags from this library: No tags from this library for this title. Log in to add tags.
Star ratings
    Average rating: 0.0 (0 votes)
Holdings
Cover image Item type Current library Home library Collection Shelving location Call number Materials specified Vol info URL Copy number Status Notes Date due Barcode Item holds Item hold queue priority Course reserves
22-AIT Thesis (Replacement) Asian Institute of Technology Library AIT Publications AIT Thesis no.ST-83-08 (Browse shelf(Opens below)) 3 Available 30050120687578
40-Archives Asian Institute of Technology Library Archives AIT Thesis no.ST-83-08 (Browse shelf(Opens below)) 1 Available 30050160013230

A thesis submitted in partial fulfillment of the requirement for the degree of Master of Engineering, School of Engineering and Technology

Thesis (M.Eng.) - Asian Institute of Technology, 1983

In this study , the existing construction management for progress control , materials, manpower and equipment at the Khao Laem Dam project has been discussed . A computer analysis for manpower allocation has been carried out. Furthermore , a proposed model. for d am construction management has been presented . Field data and information for the project were collected. According the the collected data, the management of this project seems to have insufficient manpower but too old plant machinery. Nevertheless, the delivery and procurement of materials are very sound. It is found by a computer analysis that the distribution of resources for saving manpower are easily identified. For future use. a management model is developed which could be applied to similar projects. It is apparent from this study that computer application is an essential component in complex construction management.