Construction network compression programming

By: Call Number: AIT Thesis no.797 Contributor(s): Material type: TextSeries: Asian Institute of Technology. Thesis ; no. 797Publication details: Bangkok : Asian Institute of Technology, 1975Description: 52 pSubject(s): Online resources: Dissertation note: Thesis (M.Eng.) - Asian Institute of Technology, 1975 Summary: A construction project is represented by a network with activities on arrows. All activities can be randomly arranged and events randomly numbered without repetition prior to computer processing. Cost functions are assumed to be linear. A structural model composed of columns and plates is proposed to represent activities and events of corresponding network. An algorithm is presented based on the model. A computer program in FORTRAN IV is then developed to serve the following functions: a. Checking illegal conditions of a network described above, b. Reordering the sequence of input activities. c. Renumbering events of the network in ascending order. d. Performing critical path scheduling. e . Compressing the network to a required completion time. A desired schedule is obtained regarding its minimum project cost.
Tags from this library: No tags from this library for this title. Log in to add tags.
Star ratings
    Average rating: 0.0 (0 votes)
Holdings
Cover image Item type Current library Home library Collection Shelving location Call number Materials specified Vol info URL Copy number Status Notes Date due Barcode Item holds Item hold queue priority Course reserves
22-AIT Thesis (Replacement) Asian Institute of Technology Library AIT Publications AIT Thesis no.797 (Browse shelf(Opens below)) 2 Available 30050120586630
40-Archives Asian Institute of Technology Library Archives AIT Thesis no.797 (Browse shelf(Opens below)) Available 30050160092127

A thesis submitted in partial fulfillment of the requirements for the degree of Master of Engineering at the Asian Institute of Technology, Bangkok, Thailand.

Thesis (M.Eng.) - Asian Institute of Technology, 1975

A construction project is represented by a network with activities on arrows. All activities can be randomly arranged and events randomly numbered without repetition prior to computer processing. Cost functions are assumed to be linear. A structural model composed of columns and plates is proposed to represent activities and events of corresponding network. An algorithm is presented based on the model. A computer program in FORTRAN IV is then developed to serve the following functions: a. Checking illegal conditions of a network described above, b. Reordering the sequence of input activities. c. Renumbering events of the network in ascending order. d. Performing critical path scheduling. e . Compressing the network to a required completion time. A desired schedule is obtained regarding its minimum project cost.

There are no comments on this title.

to post a comment.
คัดลอกแล้ว!