Construction planning of a large project
Call Number: AIT Thesis no. ST-88-20 Material type:
TextSeries: Asian Institute of Technology. Thesis ; no. ST-88-20Publication details: Bangkok : Asian Institute of Technology, 1988Description: 160 pSubject(s): Online resources: Dissertation note: Thesis (M.Eng.) - Asian Institute of Technology, 1988 Summary: This study attempted to apply the concepts of construction planning to a large civil engineering project consisting of three earth dams . Various activities to be executed were identified, construction methods were suggested, the durations of various activities were estimate d, and construction sequences were proposed for maximum productivity at minimum cost . A d e tailed discussion of major work items were presented and a CPM (Critical Path Method) network mod e l was us e d to portray the proposed construction plan . The reliability of the plan was then tested through comparison with actual field situation .
| Cover image | Item type | Current library | Home library | Collection | Shelving location | Call number | Materials specified | Vol info | URL | Copy number | Status | Notes | Date due | Barcode | Item holds | Item hold queue priority | Course reserves | |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
20-AIT Publication
|
Asian Institute of Technology Library AIT Publications | AIT Thesis no. ST-88-20 (Browse shelf(Opens below)) | 1 | Available | 30050003063889 | |||||||||||||
20-AIT Publication
|
Asian Institute of Technology Library AIT Publications | AIT Thesis no. ST-88-20 (Browse shelf(Opens below)) | 2 | Available | 30050003063905 | |||||||||||||
40-Archives
|
Asian Institute of Technology Library Archives | AIT Thesis no. ST-88-20 (Browse shelf(Opens below)) | 1 | Available | 30050160011416 | |||||||||||||
20-AIT Publication
|
Asian Institute of Technology Library Archives | AIT Thesis no. ST-88-20 (Browse shelf(Opens below)) | 3 | Available | 30050120927479 |
A thesis submitted in partial fulfillment of the requirements for the degree of Master of Engineering, School of Engineering and Technology
Thesis (M.Eng.) - Asian Institute of Technology, 1988
This study attempted to apply the concepts of construction planning to a large civil engineering project consisting of three earth dams . Various activities to be executed were identified, construction methods were suggested, the durations of various activities were estimate d, and construction sequences were proposed for maximum productivity at minimum cost . A d e tailed discussion of major work items were presented and a CPM (Critical Path Method) network mod e l was us e d to portray the proposed construction plan . The reliability of the plan was then tested through comparison with actual field situation .
There are no comments on this title.

AI Search