Construction planning of a large project

By: Call Number: AIT Thesis no. ST-88-20 Contributor(s): Material type: TextSeries: Asian Institute of Technology. Thesis ; no. ST-88-20Publication details: Bangkok : Asian Institute of Technology, 1988Description: 160 pSubject(s): Online resources: Dissertation note: Thesis (M.Eng.) - Asian Institute of Technology, 1988 Summary: This study attempted to apply the concepts of construction planning to a large civil engineering project consisting of three earth dams . Various activities to be executed were identified, construction methods were suggested, the durations of various activities were estimate d, and construction sequences were proposed for maximum productivity at minimum cost . A d e tailed discussion of major work items were presented and a CPM (Critical Path Method) network mod e l was us e d to portray the proposed construction plan . The reliability of the plan was then tested through comparison with actual field situation .
Tags from this library: No tags from this library for this title. Log in to add tags.
Star ratings
    Average rating: 0.0 (0 votes)
Holdings
Cover image Item type Current library Home library Collection Shelving location Call number Materials specified Vol info URL Copy number Status Notes Date due Barcode Item holds Item hold queue priority Course reserves
20-AIT Publication Asian Institute of Technology Library AIT Publications AIT Thesis no. ST-88-20 (Browse shelf(Opens below)) 1 Available 30050003063889
20-AIT Publication Asian Institute of Technology Library AIT Publications AIT Thesis no. ST-88-20 (Browse shelf(Opens below)) 2 Available 30050003063905
40-Archives Asian Institute of Technology Library Archives AIT Thesis no. ST-88-20 (Browse shelf(Opens below)) 1 Available 30050160011416
20-AIT Publication Asian Institute of Technology Library Archives AIT Thesis no. ST-88-20 (Browse shelf(Opens below)) 3 Available 30050120927479

A thesis submitted in partial fulfillment of the requirements for the degree of Master of Engineering, School of Engineering and Technology

Thesis (M.Eng.) - Asian Institute of Technology, 1988

This study attempted to apply the concepts of construction planning to a large civil engineering project consisting of three earth dams . Various activities to be executed were identified, construction methods were suggested, the durations of various activities were estimate d, and construction sequences were proposed for maximum productivity at minimum cost . A d e tailed discussion of major work items were presented and a CPM (Critical Path Method) network mod e l was us e d to portray the proposed construction plan . The reliability of the plan was then tested through comparison with actual field situation .