Contractor's algorithms through CPM networks for optimal financial policies

By: Call Number: AIT Thesis no.ST-86-32 Contributor(s): Material type: TextSeries: Asian Institute of Technology. Thesis ; no. ST-86-32Publication details: Bangkok : Asian Institute of Technology, 1986Description: 47, A-37 pSubject(s): Online resources: Dissertation note: Thesis (M.Eng.) - Asian Institute of Technology, 1986 Summary: In a CPM network of a construction project, some non critical activities normally exist and they can be shifted in such a way that the project can be more properly and economically executed by the contractor for a specific reason . This technique h as been developed a nd is termed as the well-known resource levelling by shifting the noncritical activities which also gives the contractor a chance to have a minimum financial cost or a minimum amount of fund tied up for a project. With this concept, the contractor may have better financial policies suitable algorithms have been developed in this study. Computer program has also been developed to avoid tedious manual computations and the study has been illustrated through examples.
Tags from this library: No tags from this library for this title. Log in to add tags.
Star ratings
    Average rating: 0.0 (0 votes)
Holdings
Cover image Item type Current library Home library Collection Shelving location Call number Materials specified Vol info URL Copy number Status Notes Date due Barcode Item holds Item hold queue priority Course reserves
22-AIT Thesis (Replacement) Asian Institute of Technology Library AIT Publications AIT Thesis no.ST-86-32 (Browse shelf(Opens below)) 3 Available 30050120687263
40-Archives Asian Institute of Technology Library Archives AIT Thesis no.ST-86-32 (Browse shelf(Opens below)) Available 30050160012034

A thesis study submitted in partial fulfillment of the requirements for the degree of Master of Engineering, School of Engineering and Technology

Thesis (M.Eng.) - Asian Institute of Technology, 1986

In a CPM network of a construction project, some non critical activities normally exist and they can be shifted in such a way that the project can be more properly and economically executed by the contractor for a specific reason . This technique h as been developed a nd is termed as the well-known resource levelling by shifting the noncritical activities which also gives the contractor a chance to have a minimum financial cost or a minimum amount of fund tied up for a project. With this concept, the contractor may have better financial policies suitable algorithms have been developed in this study. Computer program has also been developed to avoid tedious manual computations and the study has been illustrated through examples.