Cost information on waste treatment - a case study in Bangkok
Call Number: AIT SSPR no. EV-82-3 Material type:
SeriesSeries: Special studies project report ; no. EV-82-3 | Asian Institute of Technology. Special studies project report ; no. EV-82-3Publication details: Bangkok : Asian Institute of Technology, 1982Description: 64 pSubject(s): Dissertation note: Special Studies Project Report (M. Eng.) - Asian Institute of Technology, 1982 Summary: The study was undertaken as a first step in evaluating cost associated with wastewater treatment in Greater Bangkok Area (GBA) , Thailand. Regression equations based on statistical techniques have been developed for es- timating the capital and Operation and Maintenance (0 & M) costs of waste- water treatment plants. During data analysis, it was assumed that the cost of a treatment plant could be viewed from the cost of the entire plant. Design flow, influent biochemical oxygen demand (BODs) and population equi- valent (PE) which were thought to affect cost were considered. Forty three treatment plants were used in this study, the most important cost determinants were found to be desi&n flow and population equiva- lX.v1-eic.m of l'nvironme'1t-a1 F:rrgirteePi~ An empirical base from which future costs can be estimated was established. It was assumed that past costs could be adjusted for inflation, material and labour cost fluctuations and various other influences to yield an estimate of what similar facilities would cost in the future. This study will provide information, in the form of cost estimation to help the planner in waste treatment facilities planning and management. As more cost history becomes available, it is expected that the present data base will be expanded and updated regularly providing a more complete series of cost estimating relationship. Lastly, it must be understood that the cost equations which were developed in this study are just for estimation, and may help determine actual costs, with some reserve and modification.
| Cover image | Item type | Current library | Home library | Collection | Shelving location | Call number | Materials specified | Vol info | URL | Copy number | Status | Notes | Date due | Barcode | Item holds | Item hold queue priority | Course reserves | |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
20-AIT Publication
|
Asian Institute of Technology Library AIT Publications | AIT SSPR no. EV-82-3 (Browse shelf(Opens below)) | 1 | Available | 30050121073604 |
A special study submitted in partial fulfillment of the requirements for the degree of Master of Engineering
Special Studies Project Report (M. Eng.) - Asian Institute of Technology, 1982
The study was undertaken as a first step in evaluating cost associated with wastewater treatment in Greater Bangkok Area (GBA) , Thailand. Regression equations based on statistical techniques have been developed for es- timating the capital and Operation and Maintenance (0 & M) costs of waste- water treatment plants. During data analysis, it was assumed that the cost of a treatment plant could be viewed from the cost of the entire plant. Design flow, influent biochemical oxygen demand (BODs) and population equi- valent (PE) which were thought to affect cost were considered. Forty three treatment plants were used in this study, the most important cost determinants were found to be desi&n flow and population equiva- lX.v1-eic.m of l'nvironme'1t-a1 F:rrgirteePi~ An empirical base from which future costs can be estimated was established. It was assumed that past costs could be adjusted for inflation, material and labour cost fluctuations and various other influences to yield an estimate of what similar facilities would cost in the future. This study will provide information, in the form of cost estimation to help the planner in waste treatment facilities planning and management. As more cost history becomes available, it is expected that the present data base will be expanded and updated regularly providing a more complete series of cost estimating relationship. Lastly, it must be understood that the cost equations which were developed in this study are just for estimation, and may help determine actual costs, with some reserve and modification.
There are no comments on this title.

AI Search