Decision models for earthmoving techniques

By: Call Number: AIT Thesis no. 1167 Contributor(s): Material type: TextSeries: Asian Institute of Technology. Thesis ; no. 1167Publication details: Bangkok : Asian Institute of Technology, 1976Description: 125 pSubject(s): Online resources: Dissertation note: Thesis (M.Eng.) - Asian Institute of Technology, 1976 Summary: This research study is concerned with the earthmoving operation and earthmoving techniques in construction as general. The aim of this study is to provide decision makers of the developing countries with a set of methodological tools to assess the productivity and cost of earthmoving equipments and labour, and to determine the optimum combination of earthmoving resources in any conditions. Mathematical Models are formulated to compute t he productivity and cost of equipments and labour in different circumstances along with hypothetical examples and discussions on the parameters which influence the above factors. With the discussions of appropriate technology for developing countries in earthmoving operation, a Linear Programming Model is formulated to find the optimum combination of earthmoving resources. Examples are also given to illustrate t he Model along with a sensitivity analysis. To satisfy the multiple objectives in earthmoving operations, a Goal Programming Model is formulated with some examples. And at the end Recommendations for future work are suggested.
Tags from this library: No tags from this library for this title. Log in to add tags.
Star ratings
    Average rating: 0.0 (0 votes)
Holdings
Cover image Item type Current library Home library Collection Shelving location Call number Materials specified Vol info URL Copy number Status Notes Date due Barcode Item holds Item hold queue priority Course reserves
20-AIT Publication Asian Institute of Technology Library AIT Publications AIT Thesis no. 1167 (Browse shelf(Opens below)) 1 Available 30050003023131
20-AIT Publication Asian Institute of Technology Library AIT Publications AIT Thesis no. 1167 (Browse shelf(Opens below)) 2 Available 30050003023149
20-AIT Publication Asian Institute of Technology Library Archives AIT Thesis no. 1167 (Browse shelf(Opens below)) 3 Available 30050003023164
40-Archives Asian Institute of Technology Library Archives AIT Thesis no. 1167 (Browse shelf(Opens below)) Available 30050160087986

A thesis submitted in partial fulfillment of the requirements for the degree of Master of Engineering of the Asian Institute of Technology, Bangkok, Thailand

Thesis (M.Eng.) - Asian Institute of Technology, 1976

This research study is concerned with the earthmoving operation and earthmoving techniques in construction as general. The aim of this study is to provide decision makers of the developing countries with a set of methodological tools to assess the productivity and cost of earthmoving equipments and labour, and to determine the optimum combination of earthmoving resources in any conditions. Mathematical Models are formulated to compute t he productivity and cost of equipments and labour in different circumstances along with hypothetical examples and discussions on the parameters which influence the above factors. With the discussions of appropriate technology for developing countries in earthmoving operation, a Linear Programming Model is formulated to find the optimum combination of earthmoving resources. Examples are also given to illustrate t he Model along with a sensitivity analysis. To satisfy the multiple objectives in earthmoving operations, a Goal Programming Model is formulated with some examples. And at the end Recommendations for future work are suggested.

There are no comments on this title.

to post a comment.
คัดลอกแล้ว!