Delays in building construction projects in Thailand

By: Call Number: AIT Thesis no.ST-92-19 Contributor(s): Material type: TextSeries: Asian Institute of Technology. Thesis ; no. ST-92-19Publication details: Bangkok : Asian Institute of Technology, 1992Description: 45, A-3, B-40, C-21 leavesSubject(s): Online resources: Dissertation note: Thesis (M.Eng.) - Asian Institute of Technology, 1992 Summary: The effects of construction delays are not confined to the construction industry only but also influence the state of the overall economy of a country. This is particularly so in Thailand where delays seem to be a common problem faced by most construction projects started in the 1987-91 economic boom period. Through a survey of twelve building projects in Bangkok, Thailand, this study identifies the causes of delays experienced by the I concerns. The sources of delays were grouped into two categories: external and internal. On the external sources side, the results indicate that causes of delays are shortages of some resources, government authority and site limitations. On the internal side, it was pointed out that design-originated problems, owner's influences, coordination deficiencies and contractor's management deficiencies are the most important causes of delays. Along with the causes of delays, recommendations are suggested. This study also outlines the ideal conditions for a building construction project. The idea is intended to assist the project participants to identify the possible problem areas which have to be detected and alleviated beforehand to reduce possibility of delays in their project.
Tags from this library: No tags from this library for this title. Log in to add tags.
Star ratings
    Average rating: 0.0 (0 votes)
Holdings
Cover image Item type Current library Home library Collection Shelving location Call number Materials specified Vol info URL Copy number Status Notes Date due Barcode Item holds Item hold queue priority Course reserves
20-AIT Publication Asian Institute of Technology Library AIT Publications AIT Thesis no.ST-92-19 (Browse shelf(Opens below)) 1 Available 30050120689368
20-AIT Publication Asian Institute of Technology Library AIT Publications AIT Thesis no.ST-92-19 (Browse shelf(Opens below)) 2 Available 30050120689384
40-Archives Asian Institute of Technology Library Archives AIT Thesis no.ST-92-19 (Browse shelf(Opens below)) 1 Available 30050160022256
20-AIT Publication Asian Institute of Technology Library Archives AIT Thesis no.ST-92-19 (Browse shelf(Opens below)) 3 Available 30050120932289

The effects of construction delays are not confined to the construction industry only but also influence the state of the overall economy of a country. This is particularly so in Thailand where delays seem to be a common problem faced by most construction projects started in the 1987-91 economic boom period. Through a survey of twelve building projects in Bangkok, Thailand, this study identifies the causes of delays experienced by the I concerns. The sources of delays were grouped into two categories: external and internal. On the external sources side, the results indicate that causes of delays are shortages of some resources, government authority and site limitations. On the internal side, it was pointed out that design-originated problems, owner's influences, coordination deficiencies and contractor's management deficiencies are the most important causes of delays. Along with the causes of delays, recommendations are suggested. This study also outlines the ideal conditions for a building construction project. The idea is intended to assist the project participants to identify the possible problem areas which have to be detected and alleviated beforehand to reduce possibility of delays in their project.

A thesis submitted in partial fulfillment of the requirements for the degree of Master of Engineering, School of Engineering and Technology

Thesis (M.Eng.) - Asian Institute of Technology, 1992