Design of capacity of Sung Mao Reservoir using simulation : Ta Chia River Basin

By: Call Number: AIT Thesis no. 1359 Contributor(s): Material type: TextSeries: Asian Institute of Technology. Thesis ; no. 1359Publication details: Bangkok : Asian Institute of Technology, 1979Description: 95 pSubject(s): Online resources: Dissertation note: Thesis (M.Eng.) - Asian Institute of Technology, 1979 Summary: The existing system of serially linked reservoirs in the Ta Chia river basin is simulated using two model s. One is the HEG-3 model and the other model incorporates the release policy of the Taiwan Power Company. Many feasible rule curves are considered in the simulation. Using the same models the system with Sung Mao reservoir is then simulated. Three feasible reservoir capacities of 20, 30 and 40 MCM for Sung Mao reservoir are investigated. The sensitivity of the system responses to the rule curves of Te Chi and Sung Mao reservoirs is studied. The increase in system energy generation is found to depend almost totally on the energy generated at the Sung Mao powerplant. No significant reduction in spills is achieved by the addition of a reservoir at Sung Mao. The release rules are the important factors in the operation of this system rather than the rule curves, as the system is hardly sensitive to the rule curves of the reservoirs. Recommendations are made on the selection of the Sung Mao reservoir capacity and the most feasible operation of the system.
Tags from this library: No tags from this library for this title. Log in to add tags.
Star ratings
    Average rating: 0.0 (0 votes)
Holdings
Cover image Item type Current library Home library Collection Shelving location Call number Materials specified Vol info URL Copy number Status Notes Date due Barcode Item holds Item hold queue priority Course reserves
20-AIT Publication Asian Institute of Technology Library AIT Publications AIT Thesis no. 1359 (Browse shelf(Opens below)) 1 Available 30050003026456
40-Archives Asian Institute of Technology Library Archives AIT Thesis no. 1359 (Browse shelf(Opens below)) Available 30050160082573

A thesis submitted in partial fulfillment of the requirements for the degree of Master of Engineering of the Asian Institute of Technology, Bangkok, Thailand

Thesis (M.Eng.) - Asian Institute of Technology, 1979

The existing system of serially linked reservoirs in the Ta Chia river basin is simulated using two model s. One is the HEG-3 model and the other model incorporates the release policy of the Taiwan Power Company. Many feasible rule curves are considered in the simulation. Using the same models the system with Sung Mao reservoir is then simulated. Three feasible reservoir capacities of 20, 30 and 40 MCM for Sung Mao reservoir are investigated. The sensitivity of the system responses to the rule curves of Te Chi and Sung Mao reservoirs is studied. The increase in system energy generation is found to depend almost totally on the energy generated at the Sung Mao powerplant. No significant reduction in spills is achieved by the addition of a reservoir at Sung Mao. The release rules are the important factors in the operation of this system rather than the rule curves, as the system is hardly sensitive to the rule curves of the reservoirs. Recommendations are made on the selection of the Sung Mao reservoir capacity and the most feasible operation of the system.

There are no comments on this title.

to post a comment.
คัดลอกแล้ว!