Development of a water resources management training model

By: Call Number: AIT Thesis no. WA-88-20 Contributor(s): Material type: TextSeries: Asian Institute of Technology. Thesis ; no. WA-88-20Publication details: Bangkok : Asian Institute of Technology, 1988Description: 1 v. (various pagings)Subject(s): Online resources: Dissertation note: Thesis (M.Eng.) - Asian Institute of Technology, 1988 Summary: This study summarizes the development of a didactically oriented interactive PC-based water resources planning training model ( BNW>. It is basically a basin wide simulation model. The objective of the BNW model is to gain a better understanding of hydrologic phenomena prevailing in a water resources system and to estimate how changes in the water resources system may affect these phenomena. The system starts from the known rainfall by u sing rainfall runoff (NAM> mod el to calc ulat e the runoff hydrograph. Subsequently it uses linear reservoir theory for river routing. If there are reservoirs in the system, the regulation of conservation reservoirs will be accounted for according to given reservoir operation rule curves. Flood control reservoirs can be operated either by deriving the optimal single reservoir release policy or according to the predetermined constant target release rule. Besides, the concept of nodes and arcs is used to re p resent a physical water resources system. Flow discharge of the control points ca n be computed and monitored by this model. The BNW model is a general model. The sercan work with this program by using an introductory example input data. Besides, an imaginary river network system can be constructed and used with its own input data . Furthermore the user can also set up a mod e l system in accordance with a real world water resources system. At present the problems to b e considered in the BNW model are limited to have not more than 30 nodes and 70 time steps because of the PC computer memory. Since BNW program is written in FORTRAN language, it can be transferred to t h e mainframe computer easily. There fore the maxi mum number of time steps and maximum node numbers could be extended if BNW program is working on the mainframe . The BNW mod e l is a "working model" where as for "real world" applications a calibration version is to be
Tags from this library: No tags from this library for this title. Log in to add tags.
Star ratings
    Average rating: 0.0 (0 votes)
Holdings
Cover image Item type Current library Home library Collection Shelving location Call number Materials specified Vol info URL Copy number Status Notes Date due Barcode Item holds Item hold queue priority Course reserves
20-AIT Publication Asian Institute of Technology Library AIT Publications AIT Thesis no. WA-88-20 (Browse shelf(Opens below)) 1 Available 30050003053328
20-AIT Publication Asian Institute of Technology Library AIT Publications AIT Thesis no. WA-88-20 (Browse shelf(Opens below)) 2 Available 30050003053336
40-Archives Asian Institute of Technology Library Archives AIT Thesis no. WA-88-20 (Browse shelf(Opens below)) Available 30050160034301

A thesis submitted in partial fulfilment of the requirement for the degree of Master of Engineering, School of Engineering and Technology

Thesis (M.Eng.) - Asian Institute of Technology, 1988

This study summarizes the development of a didactically oriented interactive PC-based water resources planning training model ( BNW>. It is basically a basin wide simulation model. The objective of the BNW model is to gain a better understanding of hydrologic phenomena prevailing in a water resources system and to estimate how changes in the water resources system may affect these phenomena. The system starts from the known rainfall by u sing rainfall runoff (NAM> mod el to calc ulat e the runoff hydrograph. Subsequently it uses linear reservoir theory for river routing. If there are reservoirs in the system, the regulation of conservation reservoirs will be accounted for according to given reservoir operation rule curves. Flood control reservoirs can be operated either by deriving the optimal single reservoir release policy or according to the predetermined constant target release rule. Besides, the concept of nodes and arcs is used to re p resent a physical water resources system. Flow discharge of the control points ca n be computed and monitored by this model. The BNW model is a general model. The sercan work with this program by using an introductory example input data. Besides, an imaginary river network system can be constructed and used with its own input data . Furthermore the user can also set up a mod e l system in accordance with a real world water resources system. At present the problems to b e considered in the BNW model are limited to have not more than 30 nodes and 70 time steps because of the PC computer memory. Since BNW program is written in FORTRAN language, it can be transferred to t h e mainframe computer easily. There fore the maxi mum number of time steps and maximum node numbers could be extended if BNW program is working on the mainframe . The BNW mod e l is a "working model" where as for "real world" applications a calibration version is to be

There are no comments on this title.

to post a comment.
คัดลอกแล้ว!