Economic evaluation of different construction methods : a study in Sri-Lanka
Call Number: AIT Thesis no. ST-79-04 Material type:
TextSeries: Asian Institute of Technology. Thesis ; no. ST-79-04Publication details: Bangkok : Asian Institute of Technology, 1979Description: iv, 54 pSubject(s): Online resources: Dissertation note: Thesis (M.Eng.) - Asian Institute of Technology, 1979
| Cover image | Item type | Current library | Home library | Collection | Shelving location | Call number | Materials specified | Vol info | URL | Copy number | Status | Notes | Date due | Barcode | Item holds | Item hold queue priority | Course reserves | |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
20-AIT Publication
|
Asian Institute of Technology Library AIT Publications | AIT Thesis no. ST-79-04 (Browse shelf(Opens below)) | 1 | Available | 30050003078572 | |||||||||||||
20-AIT Publication
|
Asian Institute of Technology Library AIT Publications | AIT Thesis no. ST-79-04 (Browse shelf(Opens below)) | 2 | Available | 30050120689046 | |||||||||||||
40-Archives
|
Asian Institute of Technology Library Archives | AIT Thesis no. ST-79-04 (Browse shelf(Opens below)) | 1 | Available | 30050160014329 |
A thesis submitted in partial fulfillment of the requirements for the degree of Master of Engineering, School of Engineering and Technology
Thesis (M.Eng.) - Asian Institute of Technology, 1979
This study encompasses the evaluation of cost and labour for different methods of construction in Sri Lanka. The operations considered herein are, Brick Handling and Laying, Concreting and Concrete Formwork. The existing methods of construction as well as the suitable alternative suggested are described in detail. The cost of each operation is calculated for the two different methods. A comparison is made between construction costs and labour requirement of the methods.
There are no comments on this title.

AI Search