Effect of escalation on project costs

By: Call Number: AIT Thesis no.ST-82-27 Contributor(s): Material type: TextSeries: Asian Institute of Technology. Thesis ; no. ST-82-27Publication details: Bangkok : Asian Institute of Technology, 1982Description: v, 65 pSubject(s): Online resources: Dissertation note: Thesis (M.Eng.)- Asian Institute of Technology, 1982 Summary: This research deals with the effect of price escalation on project costs. Escalation clauses from seven different sources were reviewed and an escalation model, based on the detailed approach, suitable for building projects is proposed. Cost breakdown for thirteen building projects built in the Bangkok vicinity classified into four building categories were analyzed to summarize the cost coefficients for use in the proposed escalation model. For forecasting the future cost trends, the price indices for labor, equipment and various materials were established and regression analysis was done. The study was also extended to calculate the new cost and capital needed due to escalation. Finally, two examples were used to demonstrate the application of the findings.
Tags from this library: No tags from this library for this title. Log in to add tags.
Star ratings
    Average rating: 0.0 (0 votes)
Holdings
Cover image Item type Current library Home library Collection Shelving location Call number Materials specified Vol info URL Copy number Status Notes Date due Barcode Item holds Item hold queue priority Course reserves
22-AIT Thesis (Replacement) Asian Institute of Technology Library AIT Publications AIT Thesis no.ST-82-27 (Browse shelf(Opens below)) 3 Available 30050120687594
40-Archives Asian Institute of Technology Library Archives AIT Thesis no.ST-82-27 (Browse shelf(Opens below)) 1 Available 30050160013313

A thesis submitted in partial fulfillment of the requirements for the degree of Master of Engineering School of Engineering and Technology

Thesis (M.Eng.)- Asian Institute of Technology, 1982

This research deals with the effect of price escalation on project costs. Escalation clauses from seven different sources were reviewed and an escalation model, based on the detailed approach, suitable for building projects is proposed. Cost breakdown for thirteen building projects built in the Bangkok vicinity classified into four building categories were analyzed to summarize the cost coefficients for use in the proposed escalation model. For forecasting the future cost trends, the price indices for labor, equipment and various materials were established and regression analysis was done. The study was also extended to calculate the new cost and capital needed due to escalation. Finally, two examples were used to demonstrate the application of the findings.

There are no comments on this title.

to post a comment.
คัดลอกแล้ว!