Feasibility study of economic analysis : the case of interconnection lines between Cambodia and Thailand
Call Number: AIT Thesis no. ET-00-4 Material type:
SeriesSeries: Asian Institute of Technology. Thesis ; no. ET-00-4Publication details: Bangkok : Asian Institute of Technology, 2000Description: 146 leavesSubject(s): Online resources: Dissertation note: Thesis (M.Eng.) - Asian Institute of Technology Summary: At present, the electric power supply in Cambodia is a problem because of the high price of energy and the lack of power stations, hydroelectric and thermal power plants of sufficient capacity to respond to rapidly increasing demand. In addition, Cambodia has no transmission lines connected between the regions. Among these, Bantey Mean Chey, Siem Reap and Battambang provinces are three of the more important provinces, where economic activity is developing swiftly. However, in order to address the shortage of power supply, the new resource of power supply is the first priority to be considered by connecting transmission line from the neighbor countries. This transmission line must be capable satisfying demand in the local area and transferring excess supply to other regions throughout the country by an interconnection system
| Cover image | Item type | Current library | Home library | Collection | Shelving location | Call number | Materials specified | Vol info | URL | Copy number | Status | Notes | Date due | Barcode | Item holds | Item hold queue priority | Course reserves | |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
20-AIT Publication
|
Asian Institute of Technology Library AIT Publications | AIT Thesis no. ET-00-4 (Browse shelf(Opens below)) | 1 | Available | 30050120731707 | |||||||||||||
20-AIT Publication
|
Asian Institute of Technology Library AIT Publications | AIT Thesis no. ET-00-4 (Browse shelf(Opens below)) | 2 | Available | 30050120731715 | |||||||||||||
40-Archives
|
Asian Institute of Technology Library Archives | AIT Thesis no. ET-00-4 (Browse shelf(Opens below)) | Available | 30050120365266 |
A thesis submitted in partial fulfillment of the requirements for the degree of Master of Engineering
Thesis (M.Eng.) - Asian Institute of Technology
At present, the electric power supply in Cambodia is a problem because of the high price of energy and the lack of power stations, hydroelectric and thermal power plants of sufficient capacity to respond to rapidly increasing demand. In addition, Cambodia has no transmission lines connected between the regions. Among these, Bantey Mean Chey, Siem Reap and Battambang provinces are three of the more important provinces, where economic activity is developing swiftly. However, in order to address the shortage of power supply, the new resource of power supply is the first priority to be considered by connecting transmission line from the neighbor countries. This transmission line must be capable satisfying demand in the local area and transferring excess supply to other regions throughout the country by an interconnection system