Analysis of multi-purpose, multi-unit water resources system in Chao Phaya River basin
Call Number: AIT Thesis no. 872 Material type:
TextSeries: Asian Institute of Technology. Thesis ; no. 872Publication details: Bangkok : Asian Institute of Technology, 1975Description: 134 pSubject(s): Online resources: Dissertation note: Thesis (M.Eng.) - Asian Institute of Technology, 1975 Summary: This study concerns with the simulation of the multi-purpose, multiunit water resources system operation in the Chao Phaya River Basin Project in order to find the preferable operation procedure among many possible ones when the two reservoirs are jointly operated. The introduction of the concepts of priority, safety level or low flow level makes it possible to find out the rule curve which gives the preferable output. But this study is still academic exercise, not the practical one, since the flood control is not considered. Three reasonable conditions of priority. are assumed as follows: l) firm power (PF) secondary power (PS) wet season irrigation (Iw) and dry season irrigation (ID); 2) Iw, Pf ,Ps, Id : 3) Iw , Id , Pf , Ps. By following the rule curve that is made under these priority and low flow level conditions, and using the records of 22 years, simulation of the operation is done. The diversion requirement for irrigation and the capacity of power plant etc. are determined on the basis of the actual conditions and one space rule is assumed, Comparison of expected water supply for each sector under different conditions are done on the basis of the results of simulation. About 30% of low flow level is considered the most available level for making the rule curve, and the priority condition IW, PF, PS , ID may be acceptable.
| Cover image | Item type | Current library | Home library | Collection | Shelving location | Call number | Materials specified | Vol info | URL | Copy number | Status | Notes | Date due | Barcode | Item holds | Item hold queue priority | Course reserves | |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
20-AIT Publication
|
Asian Institute of Technology Library AIT Publications | AIT Thesis no. 872 (Browse shelf(Opens below)) | 1 | Available | 30050003037438 | |||||||||||||
20-AIT Publication
|
Asian Institute of Technology Library AIT Publications | AIT Thesis no. 872 (Browse shelf(Opens below)) | 2 | Available | 30050003037446 | |||||||||||||
40-Archives
|
Asian Institute of Technology Library Archives | AIT Thesis no. 872 (Browse shelf(Opens below)) | Available | 30050160091798 | ||||||||||||||
20-AIT Publication
|
Asian Institute of Technology Library Archives | AIT Thesis no. 872 (Browse shelf(Opens below)) | 3 | Available | 30050121099211 |
A thesis submitted in partial fulfillment of the requirements for the Degree of Master of Engineeri.ng at the Asian Institute of Technology, Bangkok, Thailand.
Thesis (M.Eng.) - Asian Institute of Technology, 1975
This study concerns with the simulation of the multi-purpose, multiunit water resources system operation in the Chao Phaya River Basin Project in order to find the preferable operation procedure among many possible ones when the two reservoirs are jointly operated. The introduction of the concepts of priority, safety level or low flow level makes it possible to find out the rule curve which gives the preferable output. But this study is still academic exercise, not the practical one, since the flood control is not considered. Three reasonable conditions of priority. are assumed as follows: l) firm power (PF) secondary power (PS) wet season irrigation (Iw) and dry season irrigation (ID); 2) Iw, Pf ,Ps, Id : 3) Iw , Id , Pf , Ps. By following the rule curve that is made under these priority and low flow level conditions, and using the records of 22 years, simulation of the operation is done. The diversion requirement for irrigation and the capacity of power plant etc. are determined on the basis of the actual conditions and one space rule is assumed, Comparison of expected water supply for each sector under different conditions are done on the basis of the results of simulation. About 30% of low flow level is considered the most available level for making the rule curve, and the priority condition IW, PF, PS , ID may be acceptable.
There are no comments on this title.

AI Search