Generation of weighting factors for evaluating management performance on construction
Call Number: AIT Thesis no.ST-88-06 Material type:
TextSeries: Asian Institute of Technology. Thesis ; no. ST-88-06Publication details: Bangkok : Asian Institute of Technology, 1988Description: 77, 20 pSubject(s): Online resources: Dissertation note: Thesis (M.Eng.) - Asian Institute of Technology, 1988 Summary: Due to the complexity and competitiveness of construction projects today, "Mechanization of Operations" and " Good Management" are two most potential approaches to win more contract by increasing the productivity. Since mechanization through ROBOTICS has its drawbacks and limitations due to the impact of environmental influences. Therefore good management may be considered to be the most significant potential area for productivity improvement. In this study quantitative system has been developed to assign relative weighting to various factors affecting management performance on construction. Questionnaires were designed to collect empirical data from t h e project managers regarding the influence of various factors on their project and also on the relative weighting of factors against themselves. This data was obtained via direct visits to projects in Hongkong, Korea & Taiwan and by mails from others; From the rank data, we generated the relative weighting of factors for all types of construction, type-oriented construction and country-oriented construction and discussed the significant differences between ranks and weightings, then convert e d rank data into numerical and sorted projects by the job conditions. Finally Linear Discriminant Function (LDF ) analysis has been used to identify the job and management conditions based on different combinations of variables, which were conducted by the correlation analysis , to find out the highest correctness of estimate accompanying with the evaluation index (Z-score ) and the best LDF equation. Thus we can e stablish the performance evaluation models through the assumptions and t he critical Z-scores. Comparing the project Z-score which is generated from LDF equation with the critical values in t h e evaluation mode l, we can assess the " efficiency " of management as good , fair or poor and make timely, proper decisions to correct the deficiencies.
| Cover image | Item type | Current library | Home library | Collection | Shelving location | Call number | Materials specified | Vol info | URL | Copy number | Status | Notes | Date due | Barcode | Item holds | Item hold queue priority | Course reserves | |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
22-AIT Thesis (Replacement)
|
Asian Institute of Technology Library AIT Publications | AIT Thesis no.ST-88-06 (Browse shelf(Opens below)) | 3 | Available | 30050120692537 | |||||||||||||
40-Archives
|
Asian Institute of Technology Library Archives | AIT Thesis no.ST-88-06 (Browse shelf(Opens below)) | 1 | Available | 30050160011556 |
A thesis submitted in partial fulfillment of the requirements for the degree of Master of Engineering, School of Engineering and Technology
Thesis (M.Eng.) - Asian Institute of Technology, 1988
Due to the complexity and competitiveness of construction projects today, "Mechanization of Operations" and " Good Management" are two most potential approaches to win more contract by increasing the productivity. Since mechanization through ROBOTICS has its drawbacks and limitations due to the impact of environmental influences. Therefore good management may be considered to be the most significant potential area for productivity improvement. In this study quantitative system has been developed to assign relative weighting to various factors affecting management performance on construction. Questionnaires were designed to collect empirical data from t h e project managers regarding the influence of various factors on their project and also on the relative weighting of factors against themselves. This data was obtained via direct visits to projects in Hongkong, Korea & Taiwan and by mails from others; From the rank data, we generated the relative weighting of factors for all types of construction, type-oriented construction and country-oriented construction and discussed the significant differences between ranks and weightings, then convert e d rank data into numerical and sorted projects by the job conditions. Finally Linear Discriminant Function (LDF ) analysis has been used to identify the job and management conditions based on different combinations of variables, which were conducted by the correlation analysis , to find out the highest correctness of estimate accompanying with the evaluation index (Z-score ) and the best LDF equation. Thus we can e stablish the performance evaluation models through the assumptions and t he critical Z-scores. Comparing the project Z-score which is generated from LDF equation with the critical values in t h e evaluation mode l, we can assess the " efficiency " of management as good , fair or poor and make timely, proper decisions to correct the deficiencies.
There are no comments on this title.

AI Search