Analyzing the logistic process for pre-engineering building (P.E.B) construction

By: Call Number: AIT Proj. no.CM-09-12 Contributor(s): Material type: SeriesSeries: Asian Institute of Technology. Project ; no. CM-09-12Publication details: Pathum Thani, Thailand : Asian Institute of Technology, 2009Description: 51 leaves : illSubject(s): Online resources: Dissertation note: Project (M. Eng.) - Asian Institute of Technology, 2009 Summary: Erection is the last important stage of P.E.B product life cycle, to complete success this stage, it is requested the fulfillment of previous stages as the erection logistic stage. However, in the real erection job sites, especially the job sites in Vietnam, there a lot of problems happened in this stage that make erection stage can not be completed as expected, by analyzing to find out the root causes of these problems from the data, which are investigated from a real P.E.B company, base on key relevant theories, the Author would like to develop the solutions for future improvements.
Tags from this library: No tags from this library for this title. Log in to add tags.
Star ratings
    Average rating: 0.0 (0 votes)
Holdings
Cover image Item type Current library Home library Collection Shelving location Call number Materials specified Vol info URL Copy number Status Notes Date due Barcode Item holds Item hold queue priority Course reserves
20-AIT Publication Asian Institute of Technology Library AIT Publications AIT Proj. no.CM-09-12 (Browse shelf(Opens below)) 1 Available 30050120688238
20-AIT Publication Asian Institute of Technology Library AIT Publications AIT Proj. no.CM-09-12 (Browse shelf(Opens below)) 2 Available 30050120742829
40-Archives Asian Institute of Technology Library Archives AIT Proj. no.CM-09-12 (Browse shelf(Opens below)) Available 30050120232573

A thesis submitted in partial fulfillment of the requirements for the degree of Master of Engineering in Construction Engineering and Infrastructure Management

Project (M. Eng.) - Asian Institute of Technology, 2009

Erection is the last important stage of P.E.B product life cycle, to complete success this stage, it is requested the fulfillment of previous stages as the erection logistic stage. However, in the real erection job sites, especially the job sites in Vietnam, there a lot of problems happened in this stage that make erection stage can not be completed as expected, by analyzing to find out the root causes of these problems from the data, which are investigated from a real P.E.B company, base on key relevant theories, the Author would like to develop the solutions for future improvements.

There are no comments on this title.

to post a comment.
คัดลอกแล้ว!