Interconnection of two hydro-thermal power systems in China
Call Number: AIT Thesis no.ET-87-6 Material type:
TextSeries: Asian Institute of Technology. Thesis ; no. ET-87-6Publication details: Bangkok : Asian Institute of Technology, 1987Description: 65 pSubject(s): Online resources: Dissertation note: Thesis (M.Eng.) - Asian Institute of Technology, 1987 Summary: This paper describes a methodology for studying the interconnection benefits arising from two hydro-thermal mixed power systems in the People's Republic of China. Fundamental principles from a literature review and theoretical considerations for developing this methodology are also included. The methodology is based on the concepts of power system production cost simulation and the dynamic prograrrroing method used in reservoir systems operation. The composite basin concept is a lso employed in this study. The savings resulting from the different inter-tie line sizes are analysed. The hydro energy transfer ability in conjunction with the optimal operation of the pooled system is the main means of showing how much the benefit would be, building in considerations of energy conservation.
| Cover image | Item type | Current library | Home library | Collection | Shelving location | Call number | Materials specified | Vol info | URL | Copy number | Status | Notes | Date due | Barcode | Item holds | Item hold queue priority | Course reserves | |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
22-AIT Thesis (Replacement)
|
Asian Institute of Technology Library AIT Publications | AIT Thesis no.ET-87-6 (Browse shelf(Opens below)) | 3 | Available | 30050120678338 | |||||||||||||
40-Archives
|
Asian Institute of Technology Library Archives | AIT Thesis no.ET-87-6 (Browse shelf(Opens below)) | Available | 30050120353049 |
A thesis submitted in partial fulfillment of the requirements for the degree of Master of Engineering, School of Environment, Resources and Development
Thesis (M.Eng.) - Asian Institute of Technology, 1987
This paper describes a methodology for studying the interconnection benefits arising from two hydro-thermal mixed power systems in the People's Republic of China. Fundamental principles from a literature review and theoretical considerations for developing this methodology are also included. The methodology is based on the concepts of power system production cost simulation and the dynamic prograrrroing method used in reservoir systems operation. The composite basin concept is a lso employed in this study. The savings resulting from the different inter-tie line sizes are analysed. The hydro energy transfer ability in conjunction with the optimal operation of the pooled system is the main means of showing how much the benefit would be, building in considerations of energy conservation.
There are no comments on this title.

AI Search