An application of GERT to the production planning function of a transformer manufacturing company
Call Number: AIT Thesis no. IE-79-03 Material type:
TextSeries: Asian Institute of Technology. Thesis ; no. IE-79-03Publication details: Bangkok : Asian Institute of Technology, 1979Description: v, 82 pSubject(s): Online resources: Dissertation note: Thesis (M.Eng.) - Asian Institute of Technology, 1979 Summary: This study is concerned with the application of GERT (Graphical Evaluation and Review Technique) to production planning problems. Emphasis is placed on intermittent, non inventor able production process. A specific study is made for the case of a transformer manufacturing company. In the case study GERT is used to model the major steps of the production process (purchasing of raw materials, preparation of engineering drawings and the production itself), and to evaluate the equivalent parameters. GERT is then used in determining the potential demand of transformers, in the near future of Thailand and in projecting the firm's resources (men, buildings, production facilities) accordingly. It is apparent that GERT is quite adaptive to various situations and gives very good visualization effect inrepresenting the production process.
| Cover image | Item type | Current library | Home library | Collection | Shelving location | Call number | Materials specified | Vol info | URL | Copy number | Status | Notes | Date due | Barcode | Item holds | Item hold queue priority | Course reserves | |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
20-AIT Publication
|
Asian Institute of Technology Library AIT Publications | AIT Thesis no. IE-79-03 (Browse shelf(Opens below)) | 1 | Available | 30050003070405 | |||||||||||||
20-AIT Publication
|
Asian Institute of Technology Library AIT Publications | AIT Thesis no. IE-79-03 (Browse shelf(Opens below)) | 2 | Available | 30050003070413 | |||||||||||||
40-Archives
|
Asian Institute of Technology Library Archives | AIT Thesis no. IE-79-03 (Browse shelf(Opens below)) | 1 | Available | 30050160011259 |
A thesis submitted in partial fulfillment of the requirements for the degree of Master of Engineering, School of Engineering and Technology
Thesis (M.Eng.) - Asian Institute of Technology, 1979
This study is concerned with the application of GERT (Graphical Evaluation and Review Technique) to production planning problems. Emphasis is placed on intermittent, non inventor able production process. A specific study is made for the case of a transformer manufacturing company. In the case study GERT is used to model the major steps of the production process (purchasing of raw materials, preparation of engineering drawings and the production itself), and to evaluate the equivalent parameters. GERT is then used in determining the potential demand of transformers, in the near future of Thailand and in projecting the firm's resources (men, buildings, production facilities) accordingly. It is apparent that GERT is quite adaptive to various situations and gives very good visualization effect inrepresenting the production process.
There are no comments on this title.

AI Search