Application of manufacturing resource planning (MRP II) : a case study

By: Call Number: AIT Thesis no. ISE-97-21 Contributor(s): Material type: TextSeries: Asian Institute of Technology. Thesis ; no. ISE-97-21Publication details: Bangkok : Asian Institute of Technology, 1997Description: 122 pSubject(s): Online resources: Dissertation note: Thesis (M.Eng.) - Asian Institute of Technology, 1997 Summary: The case to be considered in this study relates to a manufacturing firm M/s S.P.S. Cooperate Ltd. which faces the problems of increasing inventory levels, large capital investment in inventory, large space allocation, due date missing or increase in the number of stock outs, obsolescence of various items in the stock rooms, difficulty in record keeping, etc. because of using conventional production management techniques. This study mainly aims to solve some of the existing problems faced by the company, by applying Material Requirements Planning (MRP) as the basic methodology and assessing its scope for the implementation of Manufacturing Resource Planning (MRP II) system. This research has been performed in four steps. First of all a multi-criteria approach was followed to select the most suitable MRP II software for the company under consideration, available in the local Thai market. This was a most critical step and was achieved by using Analytic Hierarchy Process (AHP). Secondly to implement the system with the selected MRP II software all the required data was collected and input parameters were prepared. In third step all this prepared data was inputted in the selected MRPII software and its results recorded, analyzed and compared with the existing system. Finally the scope for the implementation of complete MRP II system, in the company under consideration, was assessed by keeping in view the various factors that may affect its implementation.
Tags from this library: No tags from this library for this title. Log in to add tags.
Star ratings
    Average rating: 0.0 (0 votes)
Holdings
Cover image Item type Current library Home library Collection Shelving location Call number Materials specified Vol info URL Copy number Status Notes Date due Barcode Item holds Item hold queue priority Course reserves
20-AIT Publication Asian Institute of Technology Library AIT Publications AIT Thesis no. ISE-97-21 (Browse shelf(Opens below)) 1 Available 30050120816060
20-AIT Publication Asian Institute of Technology Library AIT Publications AIT Thesis no. ISE-97-21 (Browse shelf(Opens below)) 2 Available 30050120816052
40-Archives Asian Institute of Technology Library Archives AIT Thesis no. ISE-97-21 (Browse shelf(Opens below)) 1 Available 30050160099072
20-AIT Publication Asian Institute of Technology Library Archives AIT Thesis no. ISE-97-21 (Browse shelf(Opens below)) 3 Available 30050121007537

A thesis submitted in partial fulfillment of the requirements for the degree of Master of Engineering, School of Advanced Technologies

Thesis (M.Eng.) - Asian Institute of Technology, 1997

The case to be considered in this study relates to a manufacturing firm M/s S.P.S. Cooperate Ltd. which faces the problems of increasing inventory levels, large capital investment in inventory, large space allocation, due date missing or increase in the number of stock outs, obsolescence of various items in the stock rooms, difficulty in record keeping, etc. because of using conventional production management techniques. This study mainly aims to solve some of the existing problems faced by the company, by applying Material Requirements Planning (MRP) as the basic methodology and assessing its scope for the implementation of Manufacturing Resource Planning (MRP II) system. This research has been performed in four steps. First of all a multi-criteria approach was followed to select the most suitable MRP II software for the company under consideration, available in the local Thai market. This was a most critical step and was achieved by using Analytic Hierarchy Process (AHP). Secondly to implement the system with the selected MRP II software all the required data was collected and input parameters were prepared. In third step all this prepared data was inputted in the selected MRPII software and its results recorded, analyzed and compared with the existing system. Finally the scope for the implementation of complete MRP II system, in the company under consideration, was assessed by keeping in view the various factors that may affect its implementation.

There are no comments on this title.

to post a comment.
คัดลอกแล้ว!