A line balancing design for a wheel-loader plant

By: Call Number: AIT Thesis no. 1114 Contributor(s): Material type: TextSeries: Asian Institute of Technology. Thesis ; no. 1114Publication details: Bangkok : Asian Institute of Technology, 1976Description: 67 pSubject(s): Online resources: Dissertation note: Thesis (M.Eng.) - Asian Institute of Technology, 1976 Summary: The main purpose of this study is to redesign a production line for a wheel-loader assembly plant. The plant concerned manufactures wheel-loaders whose design has been modified specifically to handle agricultural products, particularly tapioca and rice, which make up a large proportion of Thailand's export trade. This modified wheel-loader is extensively used throughout the Northeastern part of the country. The existing 11-work-station production line is a feasible one, in which many in-process inventories are found at some points along the production line, while non can be found at other points. The steps of the study are: (i) investigating the existing process in the wheel-loader assembly plant; (ii) breaking down the process into a set of work elements, each of which is associated with work element time and precedence requirements; (iii) applying a selected line balancing technique called "Optimum-Seeking Backtracking Technique" to· this line balancing problem and (iv) discussing the results obtained from Step (iii), and then drawing conclusions from the study. To redesign a production line, the work elements are grouped and assigned to a sequence of work stations, with the objective of minimizing the cycle time, subject to the precedence requirements and the total number of work stations not exceeding a specified line length. Eleven production lines whose lengths vary. from 5 to 15 work stations are obtained from the study. A comparison between the existing 11 work-station production line and the proposed 11-work-station production line shows that, by replacing the former with the latter, approximately 40% of labor costs per wheel-loader can be saved, and the cycle time can also be reduced from 25 down to 15 hours. A computer program written for this study is used in Step (iii). It can also be applied in solving similar line balancing problems.
Tags from this library: No tags from this library for this title. Log in to add tags.
Star ratings
    Average rating: 0.0 (0 votes)
Holdings
Cover image Item type Current library Home library Collection Shelving location Call number Materials specified Vol info URL Copy number Status Notes Date due Barcode Item holds Item hold queue priority Course reserves
20-AIT Publication Asian Institute of Technology Library AIT Publications AIT Thesis no. 1114 (Browse shelf(Opens below)) 1 Available 30050003021861
40-Archives Asian Institute of Technology Library Archives AIT Thesis no. 1114 (Browse shelf(Opens below)) Available 30050160088315

A thesis submitted in partial fulfillment of the requirements for the degree of Master of Engineering of the Asian Institute of Technology Bangkok, Thailand.

Thesis (M.Eng.) - Asian Institute of Technology, 1976

The main purpose of this study is to redesign a production line for a wheel-loader assembly plant. The plant concerned manufactures wheel-loaders whose design has been modified specifically to handle agricultural products, particularly tapioca and rice, which make up a large proportion of Thailand's export trade. This modified wheel-loader is extensively used throughout the Northeastern part of the country. The existing 11-work-station production line is a feasible one, in which many in-process inventories are found at some points along the production line, while non can be found at other points. The steps of the study are: (i) investigating the existing process in the wheel-loader assembly plant; (ii) breaking down the process into a set of work elements, each of which is associated with work element time and precedence requirements; (iii) applying a selected line balancing technique called "Optimum-Seeking Backtracking Technique" to· this line balancing problem and (iv) discussing the results obtained from Step (iii), and then drawing conclusions from the study. To redesign a production line, the work elements are grouped and assigned to a sequence of work stations, with the objective of minimizing the cycle time, subject to the precedence requirements and the total number of work stations not exceeding a specified line length. Eleven production lines whose lengths vary. from 5 to 15 work stations are obtained from the study. A comparison between the existing 11 work-station production line and the proposed 11-work-station production line shows that, by replacing the former with the latter, approximately 40% of labor costs per wheel-loader can be saved, and the cycle time can also be reduced from 25 down to 15 hours. A computer program written for this study is used in Step (iii). It can also be applied in solving similar line balancing problems.