Applications of network techniques in the construction industry

By: Call Number: AIT Thesis no. 1336 Contributor(s): Material type: TextSeries: Asian Institute of Technology. Thesis ; no. 1336Publication details: Bangkok : Asian Institute of Technology, 1978Description: 66 pSubject(s): Online resources: Dissertation note: Thesis (M.Eng.) - Asian Institute of Technology, 1978 Summary: The application of Network Techniques in the construction industry is investigated. The primary purpose is to determine the completion time of a construction project and its associated probability distribution. A comparison is made among several network techniques, CPM, PERT and simulation models using historical productivities through Monte Carlo technique as prime estimators. The result of this study is expected to give a more realistic result of the project time which will be used primarily for planning.
Tags from this library: No tags from this library for this title. Log in to add tags.
Star ratings
    Average rating: 0.0 (0 votes)
Holdings
Cover image Item type Current library Home library Collection Shelving location Call number Materials specified Vol info URL Copy number Status Notes Date due Barcode Item holds Item hold queue priority Course reserves
20-AIT Publication Asian Institute of Technology Library AIT Publications AIT Thesis no. 1336 (Browse shelf(Opens below)) 1 Available 30050003026001
20-AIT Publication Asian Institute of Technology Library AIT Publications AIT Thesis no. 1336 (Browse shelf(Opens below)) 2 Available 30050003025979
40-Archives Asian Institute of Technology Library Archives AIT Thesis no. 1336 (Browse shelf(Opens below)) Available 30050160082672

A thesis submitted in partial fulfillment of the requirements for the degree of Master of Engineering of the Asian Institute of Technology, Bangkok, Thailand

Thesis (M.Eng.) - Asian Institute of Technology, 1978

The application of Network Techniques in the construction industry is investigated. The primary purpose is to determine the completion time of a construction project and its associated probability distribution. A comparison is made among several network techniques, CPM, PERT and simulation models using historical productivities through Monte Carlo technique as prime estimators. The result of this study is expected to give a more realistic result of the project time which will be used primarily for planning.

There are no comments on this title.

to post a comment.
คัดลอกแล้ว!