Applications of network techniques in the construction industry
Call Number: AIT Thesis no. 1336 Material type:
TextSeries: Asian Institute of Technology. Thesis ; no. 1336Publication details: Bangkok : Asian Institute of Technology, 1978Description: 66 pSubject(s): Online resources: Dissertation note: Thesis (M.Eng.) - Asian Institute of Technology, 1978 Summary: The application of Network Techniques in the construction industry is investigated. The primary purpose is to determine the completion time of a construction project and its associated probability distribution. A comparison is made among several network techniques, CPM, PERT and simulation models using historical productivities through Monte Carlo technique as prime estimators. The result of this study is expected to give a more realistic result of the project time which will be used primarily for planning.
| Cover image | Item type | Current library | Home library | Collection | Shelving location | Call number | Materials specified | Vol info | URL | Copy number | Status | Notes | Date due | Barcode | Item holds | Item hold queue priority | Course reserves | |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
20-AIT Publication
|
Asian Institute of Technology Library AIT Publications | AIT Thesis no. 1336 (Browse shelf(Opens below)) | 1 | Available | 30050003026001 | |||||||||||||
20-AIT Publication
|
Asian Institute of Technology Library AIT Publications | AIT Thesis no. 1336 (Browse shelf(Opens below)) | 2 | Available | 30050003025979 | |||||||||||||
40-Archives
|
Asian Institute of Technology Library Archives | AIT Thesis no. 1336 (Browse shelf(Opens below)) | Available | 30050160082672 |
A thesis submitted in partial fulfillment of the requirements for the degree of Master of Engineering of the Asian Institute of Technology, Bangkok, Thailand
Thesis (M.Eng.) - Asian Institute of Technology, 1978
The application of Network Techniques in the construction industry is investigated. The primary purpose is to determine the completion time of a construction project and its associated probability distribution. A comparison is made among several network techniques, CPM, PERT and simulation models using historical productivities through Monte Carlo technique as prime estimators. The result of this study is expected to give a more realistic result of the project time which will be used primarily for planning.
There are no comments on this title.

AI Search