Marginal costs of electricity supply in a predominantly hydro power system : case of Nepal
Call Number: AIT Thesis no. ET-90-13 Material type:
TextSeries: Asian Institute of Technology. Thesis ; no. ET-90-13Publication details: Bangkok : Asian Institute of Technology, 1990Description: 115 pSubject(s): Online resources: Dissertation note: Thesis (M.Eng.) - Asian Institute of Technology, 1990 Summary: This study calculates marginal costs of electricity supply. Mixed integer programming model has been used in the expansion planning analysis. Seasonal marginal capacity and energy costs at generation and various voltage levels of transmission and distribution have been calculated . For the calculation of the marginal energy cost at generation level a linear programmine simulation model has been used. Th e long-run mareinal capacity costs have been calculated as the average incremental cost of the plant. These are the strict margi.nal costs of supply without consumer related costs. Th e marginal capac.lty costs for all voltage levels at peak periods are found to be significantly higher than the capacity charges in the existine rates. But the energy charge in the existing rate structure is higher t h an the average marginal energy costs.
| Cover image | Item type | Current library | Home library | Collection | Shelving location | Call number | Materials specified | Vol info | URL | Copy number | Status | Notes | Date due | Barcode | Item holds | Item hold queue priority | Course reserves | |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
20-AIT Publication
|
Asian Institute of Technology Library AIT Publications | AIT Thesis no. ET-90-13 (Browse shelf(Opens below)) | 1 | Available | 30050003105524 | |||||||||||||
20-AIT Publication
|
Asian Institute of Technology Library AIT Publications | AIT Thesis no. ET-90-13 (Browse shelf(Opens below)) | 2 | Available | 30050003105516 | |||||||||||||
40-Archives
|
Asian Institute of Technology Library Archives | AIT Thesis no. ET-90-13 (Browse shelf(Opens below)) | Available | 30050120344329 |
A thesis submitted in partial fulfillment of the requirements of Master of Engineering, School of Engineering and Technology
Thesis (M.Eng.) - Asian Institute of Technology, 1990
This study calculates marginal costs of electricity supply. Mixed integer programming model has been used in the expansion planning analysis. Seasonal marginal capacity and energy costs at generation and various voltage levels of transmission and distribution have been calculated . For the calculation of the marginal energy cost at generation level a linear programmine simulation model has been used. Th e long-run mareinal capacity costs have been calculated as the average incremental cost of the plant. These are the strict margi.nal costs of supply without consumer related costs. Th e marginal capac.lty costs for all voltage levels at peak periods are found to be significantly higher than the capacity charges in the existine rates. But the energy charge in the existing rate structure is higher t h an the average marginal energy costs.
There are no comments on this title.

AI Search