Owner's design management in EPC project : a case study of civil work of Vung Ang 1 Thermal Power Plant
Call Number: AIT Proj. no.MPM-CM-15-41 Material type:
SeriesSeries: Asian Institute of Technology. Project ; no. MPM-CM-15-41Publication details: Pathum Thani, Thailand : Asian Institute of Technology, 2015Description: 69 leaves : illSubject(s): Online resources: Dissertation note: Project (M. Eng.) - Asian Institute of Technology, 2015 Summary: The implementation of construction project in the form of EPC was applied in Vietnam from the la te 90s of the twentieth century. Many EPC projects have been successful, but also many projects behind schedule, cost overrun. The result of this situation is that the Owner{u2019}s design management has not been adequate attention. Better understanding of the situation, the report has been studied the Owner{u2019}s civil design management in EPC project as Vung Ang 1 thermal power plant from Feasibility phase to EPC phase. The research also analyze strengths, weakness of th e project and develop a framework of design management in EPC project. In addition, some recommendations were suggested to improve the design quality of power thermal projects
| Cover image | Item type | Current library | Home library | Collection | Shelving location | Call number | Materials specified | Vol info | URL | Copy number | Status | Notes | Date due | Barcode | Item holds | Item hold queue priority | Course reserves | |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
20-AIT Publication
|
Asian Institute of Technology Library AIT Publications | AIT Proj. no.MPM-CM-15-41 (Browse shelf(Opens below)) | 1 | Available | 30050120513584 | |||||||||||||
20-AIT Publication
|
Asian Institute of Technology Library AIT Publications | AIT Proj. no.MPM-CM-15-41 (Browse shelf(Opens below)) | 2 | Available | 30050120513592 |
A project submitted in partial fulfillment of the requirements for the degree of Master of Engineering (Professional) in Construction Engineering and Infrastructure Management, School of Engineering and Technology
Project (M. Eng.) - Asian Institute of Technology, 2015
The implementation of construction project in the form of EPC was applied in Vietnam from the la te 90s of the twentieth century. Many EPC projects have been successful, but also many projects behind schedule, cost overrun. The result of this situation is that the Owner{u2019}s design management has not been adequate attention. Better understanding of the situation, the report has been studied the Owner{u2019}s civil design management in EPC project as Vung Ang 1 thermal power plant from Feasibility phase to EPC phase. The research also analyze strengths, weakness of th e project and develop a framework of design management in EPC project. In addition, some recommendations were suggested to improve the design quality of power thermal projects
There are no comments on this title.

AI Search