Performance of earth pressure balance shield in Bangkok waste water tunnel project

By: Call Number: AIT Thesis no. GE-95-27 Contributor(s): Material type: TextSeries: Asian Institute of Technology. Thesis ; no. GE-95-27Publication details: Bangkok : Asian Institute of Technology, 1996Description: 168 leavesSubject(s): Online resources: Dissertation note: Thesis (M. Sc.) - Asian Institute of Technology, 1996 Summary: In this study the performance of the Earth Pressure Balance Shield in Bangkok Waste Water Tunnel Project Stage-1 was evaluated and summarized. The activities associated with the tunnel construction by using EPBS was analyzed with respect to the time used in each activity, the average of excavation time and the delay time were 51.49% and 48.51 % respectively. The penetration rate and the advance rate were 1.57 m/hr and 8.4 m/day respectively . Jack thrust capacity used was 15 .25% of the design. The tunnel construction procedure by using EPBS has been studied including the associated shaft construction. Ground surface settlement was observed along the tunnel route respected to the shield advancement. The maximum ground surface settlement was 10 - 30 mm in stiff clay and 20 - 40 mm in soft clay layer. The ground loss was up to 5% due to the low efficiency of grouting. As a result from this study, the performance of EPBS was given the high progressive work, less of problem during construction and induced the small amount of ground surface settlement, therefore the EPBS was suitable for tunnel construction in Bangkok subsoils.
Tags from this library: No tags from this library for this title. Log in to add tags.
Star ratings
    Average rating: 0.0 (0 votes)
Holdings
Cover image Item type Current library Home library Collection Shelving location Call number Materials specified Vol info URL Copy number Status Notes Date due Barcode Item holds Item hold queue priority Course reserves
20-AIT Publication Asian Institute of Technology Library AIT Publications AIT Thesis no. GE-95-27 (Browse shelf(Opens below)) 1 Available 30020220000437
40-Archives Asian Institute of Technology Library Archives AIT Thesis no. GE-95-27 (Browse shelf(Opens below)) 1 Available 30050160081609

A thesis submitted in partial fulfilment of the requirements for the degree of Master of Science, School of Civil Engineering

Thesis (M. Sc.) - Asian Institute of Technology, 1996

In this study the performance of the Earth Pressure Balance Shield in Bangkok Waste Water Tunnel Project Stage-1 was evaluated and summarized. The activities associated with the tunnel construction by using EPBS was analyzed with respect to the time used in each activity, the average of excavation time and the delay time were 51.49% and 48.51 % respectively. The penetration rate and the advance rate were 1.57 m/hr and 8.4 m/day respectively . Jack thrust capacity used was 15 .25% of the design. The tunnel construction procedure by using EPBS has been studied including the associated shaft construction. Ground surface settlement was observed along the tunnel route respected to the shield advancement. The maximum ground surface settlement was 10 - 30 mm in stiff clay and 20 - 40 mm in soft clay layer. The ground loss was up to 5% due to the low efficiency of grouting. As a result from this study, the performance of EPBS was given the high progressive work, less of problem during construction and induced the small amount of ground surface settlement, therefore the EPBS was suitable for tunnel construction in Bangkok subsoils.

There are no comments on this title.

to post a comment.
คัดลอกแล้ว!