Performance of full scale embankment with hexagonal wire mesh reinforcement and gabion facing
Call Number: AIT Thesis no. GE-97-11 Material type:
SeriesSeries: Asian Institute of Technology. Thesis ; no. GE-97-11Publication details: Bangkok : Asian Institute of Technology, 1998Description: 121 leaves : illSubject(s): Online resources: Dissertation note: Thesis (M.Eng.) - Asian Institute of Technology Summary: This study are focus on field behavior of mechanically stabilized embankment which was carried out on a fully instrumented hexagonal wire mesh reinforcement constructed on soft clay foundation at Asian Institute of Technology campus. The reinforced wall consist of 80 degree gabion cages facing on one side and a sloping umeinforced opposite side with the total height of 5.71 meters. Settlements, pore pressure, lateral movement of subsoil were monitored during and after construction. Laboratory and in-situ test of subsoil foundation were carried out. By observing the lateral movements and settlements. It was observed that the maximum settlement of 0.350 m for 200 days after construction while the settlement prediction by using one-dimensional (Terzaghi, 1947), three-dimensional (Skempton and Bjerrum, 1957), the method proposed by Asaoka (1978) and the water content method (Bergado et al, 1995) were found to be higher than observations which are 579 mm, 522 mm, 448 mm and 576 mm, respectively. The degree of consolidation of the foundation subsoil is 78% at 200 days after construction. The maximum lateral movement was 0.15 m for 200 days after construction that was occurred in foundation soil at 3 to 4 m depth. The maximum excess pore water pressure for both type of hexagonal wire mesh area occur 2.7 and 3.3 t/m 2 at 3 m and 6 m depth, respectively, for 7 days after construction. The external stability was analyzed namely ove1turning, horizontal sliding and bearing capacity. The factor of safety for those stability are 25, 5.6 and 1.2, respectively.
| Cover image | Item type | Current library | Home library | Collection | Shelving location | Call number | Materials specified | Vol info | URL | Copy number | Status | Notes | Date due | Barcode | Item holds | Item hold queue priority | Course reserves | |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
20-AIT Publication
|
Asian Institute of Technology Library AIT Publications | AIT Thesis no. GE-97-11 (Browse shelf(Opens below)) | 1 | Available | 30050120717623 | |||||||||||||
20-AIT Publication
|
Asian Institute of Technology Library AIT Publications | AIT Thesis no. GE-97-11 (Browse shelf(Opens below)) | 2 | Available | 30050120717607 | |||||||||||||
40-Archives
|
Asian Institute of Technology Library Archives | AIT Thesis no. GE-97-11 (Browse shelf(Opens below)) | 1 | Available | 30050160081096 |
A thesis submitted in partial fulfillment of the requirements for the degree of Master of Engineering, School of Civil Engineering
Thesis (M.Eng.) - Asian Institute of Technology
This study are focus on field behavior of mechanically stabilized embankment which was carried out on a fully instrumented hexagonal wire mesh reinforcement constructed on soft clay foundation at Asian Institute of Technology campus. The reinforced wall consist of 80 degree gabion cages facing on one side and a sloping umeinforced opposite side with the total height of 5.71 meters. Settlements, pore pressure, lateral movement of subsoil were monitored during and after construction. Laboratory and in-situ test of subsoil foundation were carried out. By observing the lateral movements and settlements. It was observed that the maximum settlement of 0.350 m for 200 days after construction while the settlement prediction by using one-dimensional (Terzaghi, 1947), three-dimensional (Skempton and Bjerrum, 1957), the method proposed by Asaoka (1978) and the water content method (Bergado et al, 1995) were found to be higher than observations which are 579 mm, 522 mm, 448 mm and 576 mm, respectively. The degree of consolidation of the foundation subsoil is 78% at 200 days after construction. The maximum lateral movement was 0.15 m for 200 days after construction that was occurred in foundation soil at 3 to 4 m depth. The maximum excess pore water pressure for both type of hexagonal wire mesh area occur 2.7 and 3.3 t/m 2 at 3 m and 6 m depth, respectively, for 7 days after construction. The external stability was analyzed namely ove1turning, horizontal sliding and bearing capacity. The factor of safety for those stability are 25, 5.6 and 1.2, respectively.
There are no comments on this title.

AI Search