Assessing integrated delivery characteristics in hydropower plant projects in Vietnam : a case study of THACMO hydropower station extension project

By: Call Number: AIT Proj. no.MPM-CM-20-14 Contributor(s): Material type: SeriesSeries: Asian Institute of Technology. Project ; no. MPM-CM-20-14Publication details: Pathum Thani, Thailand : Asian Institute of Technology, 2020Description: 76 leaves : illSubject(s): Online resources: Dissertation note: Project (M. Eng.) - Asian Institute of Technology, 2020 Summary: Integrated project delivery (IPD) is known as a modern project delivery method that creates high efficiency in the construction industry by providing accurate information and applying new technologies through collaborative environments. The study objective of thesis is TME project that invested by Electricity of Vietnam (EVN) and funded by JICA to supply electricity to the national electricity system of Vietnam with a capacity of 75 MW. The purpose of the thesis is to comprehensively analyze the characteristics of the IPD method and the TME Project through the aspects of contract, process, information & modeling, team and communication. The results show that the TME Project has several strengths and many weaknesses related to IPD characteristics. It is considered the main cause of the delay and cost overruns of the TME Project. Through this study, we also learned lessons learnts and made recommendations for hydropower projects in future.
Tags from this library: No tags from this library for this title. Log in to add tags.
Star ratings
    Average rating: 0.0 (0 votes)
Holdings
Cover image Item type Current library Home library Collection Shelving location Call number Materials specified Vol info URL Copy number Status Notes Date due Barcode Item holds Item hold queue priority Course reserves
67-Electronic Resource Asian Institute of Technology Library Archives AIT Proj. no.MPM-CM-20-14 (Browse shelf(Opens below)) Not for loan

A project submitted in partial fulfillment of the requirements for the degree of Master of Engineering (Professional) in Construction Engineering and Infrastructure Management

Project (M. Eng.) - Asian Institute of Technology, 2020

Integrated project delivery (IPD) is known as a modern project delivery method that creates high efficiency in the construction industry by providing accurate information and applying new technologies through collaborative environments. The study objective of thesis is TME project that invested by Electricity of Vietnam (EVN) and funded by JICA to supply electricity to the national electricity system of Vietnam with a capacity of 75 MW. The purpose of the thesis is to comprehensively analyze the characteristics of the IPD method and the TME Project through the aspects of contract, process, information & modeling, team and communication. The results show that the TME Project has several strengths and many weaknesses related to IPD characteristics. It is considered the main cause of the delay and cost overruns of the TME Project. Through this study, we also learned lessons learnts and made recommendations for hydropower projects in future.

There are no comments on this title.

to post a comment.
คัดลอกแล้ว!