Assessment of a geothermal power project in Vietnam for implementation under clean development mechanism
Call Number: AIT RSPR no.ET-07-02 Material type:
SeriesSeries: Asian Institute of Technology. Research studies project report ; no. ET-07-02Publication details: Pathum Thani, Thailand : Asian Institute of Technology, 2007Description: 102 p. : illSubject(s): Online resources: Dissertation note: Research Studies Project Report (M.Eng.) - Asian Institute of Technology, 2007 Summary: Vietnam has a large potential of geothermal power, Thus, the potential of geothermal dedicated for power generation is rather high. However, geothermal technology in Vietnam now is under development stage in which its commercialization process is still very limited. The study assesses of a geothermal power project in Vietnam for implementation under Clean Development Mechanism (CDM) of the Kyoto Protocol of the United Nations Framework Convention for. Climate Change. This study will discuss the additionality assessment, determine of Baseline, emission and CERs, financial Analysis of the geothermal project with and without CDM and Sensitivities Analyses for 21.4 MW geothermal power plant at Mo Due district, Quang Ngai province in Vietnam under clean development mechanism. Additionality assessment of the project is mainly based on investment analysis using FIRR, NPV and B/C ratio and sensitivity analysis, barriers analysis and analysis of prevalence of activities similar to the proposed CDM project. The project boundary considered is the Vietnam power grid, The baseline scenario is the amount (and type) of electricity that would have otherwise been generated by the operation of grid-connected power plants and by the addition of new generation sources. In accordance with the Baseline Methodology (ACM0006), the Combined Margin (the average of the Operating Margin and Build Margin) is deemed to best represent what would occur in the absence of the project. The amount of CER of Moduc Geothermal Power Project is estimated for a crediting period of 10 years and the annual electricity generation from for the project is 119.2GWh. After financial analysis of Moduc Geothermal Power Project with and without CDM, the project is shown to be financially feasible if the revenues from the sale of CERs at CER price of 5 US$/ton CO2 is included, if the CER price is equal to or less than 4 US$/ton CO2, the project would not be financially viable. Similarly, the project would not be viable if the buyback rate is less than 4.5 cent/kWh.
| Cover image | Item type | Current library | Home library | Collection | Shelving location | Call number | Materials specified | Vol info | URL | Copy number | Status | Notes | Date due | Barcode | Item holds | Item hold queue priority | Course reserves | |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
22-AIT Thesis (Replacement)
|
Asian Institute of Technology Library AIT Publications | AIT RSPR no.ET-07-02 (Browse shelf(Opens below)) | 3 | Available | 30050120613673 | |||||||||||||
40-Archives
|
Asian Institute of Technology Library Archives | AIT RSPR no.ET-07-02 (Browse shelf(Opens below)) | Available | 30050160015029 |
A research study submitted in partial fulfillment of the requirements for the degree of Master of Engineering in Energy
Research Studies Project Report (M.Eng.) - Asian Institute of Technology, 2007
Vietnam has a large potential of geothermal power, Thus, the potential of geothermal dedicated for power generation is rather high. However, geothermal technology in Vietnam now is under development stage in which its commercialization process is still very limited. The study assesses of a geothermal power project in Vietnam for implementation under Clean Development Mechanism (CDM) of the Kyoto Protocol of the United Nations Framework Convention for. Climate Change. This study will discuss the additionality assessment, determine of Baseline, emission and CERs, financial Analysis of the geothermal project with and without CDM and Sensitivities Analyses for 21.4 MW geothermal power plant at Mo Due district, Quang Ngai province in Vietnam under clean development mechanism. Additionality assessment of the project is mainly based on investment analysis using FIRR, NPV and B/C ratio and sensitivity analysis, barriers analysis and analysis of prevalence of activities similar to the proposed CDM project. The project boundary considered is the Vietnam power grid, The baseline scenario is the amount (and type) of electricity that would have otherwise been generated by the operation of grid-connected power plants and by the addition of new generation sources. In accordance with the Baseline Methodology (ACM0006), the Combined Margin (the average of the Operating Margin and Build Margin) is deemed to best represent what would occur in the absence of the project. The amount of CER of Moduc Geothermal Power Project is estimated for a crediting period of 10 years and the annual electricity generation from for the project is 119.2GWh. After financial analysis of Moduc Geothermal Power Project with and without CDM, the project is shown to be financially feasible if the revenues from the sale of CERs at CER price of 5 US$/ton CO2 is included, if the CER price is equal to or less than 4 US$/ton CO2, the project would not be financially viable. Similarly, the project would not be viable if the buyback rate is less than 4.5 cent/kWh.