Assessment of HEC-HMS model to simulate river discharge : a case of Wangchu River Basin in Bhutan
Call Number: AIT Caps. Proj. no.CIE-16-01 Material type:
SeriesSeries: Asian Institute of Technology. Caps. Proj ; no. CIE-16-01Publication details: Pathum Thani : Asian Institute of Technology, 2016Description: 47 leaves : ill. (some col.)Subject(s): Online resources: Dissertation note: Capstone Project (B.Sc.)-Asian Institute of Technology, 2016 Summary: The use of HEC-HMS (Hydrological Engineering Center, Hydrological Modeling System) is not very commonly used applied in Bhutan. This paper attempts to present the simulation of river discharge for the Wangchu river basin in Bhutan using HEC-HMS. The DEM (Digital Elevation Model) resolution of 90 x 90 meters was obtained from the National Land Commission Secretariat of Bhutan. The watershed delineation, DEM recon- ditioning, terrain processing and basin model were processed using ArcHydro and HEC- HMS. The observed meteorological data obtained from the DoHS, MOEA, Bhutan was used to calibrate and validate the model.
| Cover image | Item type | Current library | Home library | Collection | Shelving location | Call number | Materials specified | Vol info | URL | Copy number | Status | Notes | Date due | Barcode | Item holds | Item hold queue priority | Course reserves | |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
40-Archives
|
Asian Institute of Technology Library Archives | AIT Caps. Proj. no.CIE-16-01 (Browse shelf(Opens below)) | 1 | Available | 30050120395768 | |||||||||||||
61-CD-ROM
|
Asian Institute of Technology Library Archives | AIT Caps. Proj. no.CIE-16-01 (Browse shelf(Opens below)) | Available | |||||||||||||||
20-AIT Publication
|
Asian Institute of Technology Library AIT Publications | AIT Caps. Proj. no.CIE-16-01 (Browse shelf(Opens below)) | 1 | Available | 30050120973937 |
A capstone project report submitted in partial fulfillment of the requirements for the degree of Bachelor of Science in Engineering Civil And Infrastructure Engineering, School of Engineering and Technology
Capstone Project (B.Sc.)-Asian Institute of Technology, 2016
The use of HEC-HMS (Hydrological Engineering Center, Hydrological Modeling System) is not very commonly used applied in Bhutan. This paper attempts to present the simulation of river discharge for the Wangchu river basin in Bhutan using HEC-HMS. The DEM (Digital Elevation Model) resolution of 90 x 90 meters was obtained from the National Land Commission Secretariat of Bhutan. The watershed delineation, DEM recon- ditioning, terrain processing and basin model were processed using ArcHydro and HEC- HMS. The observed meteorological data obtained from the DoHS, MOEA, Bhutan was used to calibrate and validate the model.
There are no comments on this title.

AI Search