Production planning models for a refractory production system

By: Call Number: AIT RSPR no. IE-85-15 Contributor(s): Material type: SeriesSeries: Asian Institute of Technology. Research studies project report ; no. IE-85-15Publication details: Bangkok : Asian Institute of Technology, 1985Description: 1 v. (various pagings)Subject(s): Online resources: Dissertation note: Research Studies Project Report (M. Eng.) - Asian Institute of Technology, 1985 Summary: This research study covers all production planning requirements for Refractory Plant . It includes production scheduling , raw material requirements planning, manpower planning, and plant capacity planning. Actually, these models are divided to three levels for different purpose of planning . The short-term plan is the lowest level to find the exact schedule of production . The medium-term plan is the level of preparing facilities for short-term plan. The long-term plan is for predicting the future and preparing facilities for the future. The scheduling model is a simulation model using real data . The medium-term and long-term production models are aggregate production model (APP) using linear programming technique to solve the problems. The manpower planning model uses a heuristic model to choose the best schedule of workers and number of workers required for each machine . The material requirements planning model use results of APP and the modification of MRP to solve the problem. The plant capacity planning is a part of APP model.
Tags from this library: No tags from this library for this title. Log in to add tags.
Star ratings
    Average rating: 0.0 (0 votes)
Holdings
Cover image Item type Current library Home library Collection Shelving location Call number Materials specified Vol info URL Copy number Status Notes Date due Barcode Item holds Item hold queue priority Course reserves
20-AIT Publication Asian Institute of Technology Library AIT Publications AIT RSPR no. IE-85-15 (Browse shelf(Opens below)) 1 Available 30050003110631
20-AIT Publication Asian Institute of Technology Library AIT Publications AIT RSPR no. IE-85-15 (Browse shelf(Opens below)) 2 Available 30050003110623
40-Archives Asian Institute of Technology Library Archives AIT RSPR no. IE-85-15 (Browse shelf(Opens below)) Available 30050160109749

A research study submitted in partial fulfillment of the requirements for the degree of Master of Engineering, School of Engineering and Technology

Research Studies Project Report (M. Eng.) - Asian Institute of Technology, 1985

This research study covers all production planning requirements for Refractory Plant . It includes production scheduling , raw material requirements planning, manpower planning, and plant capacity planning. Actually, these models are divided to three levels for different purpose of planning . The short-term plan is the lowest level to find the exact schedule of production . The medium-term plan is the level of preparing facilities for short-term plan. The long-term plan is for predicting the future and preparing facilities for the future. The scheduling model is a simulation model using real data . The medium-term and long-term production models are aggregate production model (APP) using linear programming technique to solve the problems. The manpower planning model uses a heuristic model to choose the best schedule of workers and number of workers required for each machine . The material requirements planning model use results of APP and the modification of MRP to solve the problem. The plant capacity planning is a part of APP model.