Assessment on applicability of sequential tunnel excavation in Bangkok soft ground by means of numerical analysis

By: Call Number: AIT Thesis no.GE-12-04 Contributor(s): Material type: SeriesSeries: Asian Institute of Technology. Thesis ; no. GE-12-04Publication details: Pathum Thani, Thailand : Asian Institute of Technology, 2013Description: 1 online resource (122 p.) : ill. + 1 online resourceSubject(s): Online resources: Dissertation note: Thesis (M. Eng.) - Asian Institute of Technology, 2013 Summary: Mechanized tunneling is always feasible and justified with its boring length and in case of short length tunnels or cross cuts between two tunnels or a non circular tunnels required then the excavation method is to be changed from mechanized to the conventional excavation method. A numerical study is performed for assessment of applicability of sequential tunnel excavation in Bangkok subsoil condition. Three schemes of sequential excavation are investigated using the Mohr Coulomb and the Hardening soil model. Three water pressure conditions in the soil layers are defined to explore the effect on tunneling. The undrained effective stress analysis is performed using effective strength and stiffness parameters. The 2D plane strain model is implemented with consideration of the 3D face effect by stress reduction method. Shotcrete lining is considered with two different stiffness values to incorporate approximate effect of shotcrete aging. The results demonstrate that sequential tunnel excavation is not feasible in Bangkok subsoil. Two mechanisms of failure are found first is failure of soil cover above roof and second is the base heave. However, with improved ground it is possible to excavate the tunnel sequentially. Increase in dimension or strength of improved ground results in reduction in lining loads and surface settlement. Hardening soil model results in narrow and deeper surface settlement troughs if compared to the Mohr Coulomb model result. Water pressure variation results in higher bending moment in lining.
Tags from this library: No tags from this library for this title. Log in to add tags.
Star ratings
    Average rating: 0.0 (0 votes)
Holdings
Cover image Item type Current library Home library Collection Shelving location Call number Materials specified Vol info URL Copy number Status Notes Date due Barcode Item holds Item hold queue priority Course reserves
20-AIT Publication Asian Institute of Technology Library AIT Publications AIT Thesis no.GE-12-04 (Browse shelf(Opens below)) 1 Available 30050120813547
20-AIT Publication Asian Institute of Technology Library AIT Publications AIT Thesis no.GE-12-04 (Browse shelf(Opens below)) 2 Available 30050120813539
40-Archives Asian Institute of Technology Library Archives AIT Thesis no.GE-12-04 (Browse shelf(Opens below)) 1 Available 30050120401822

A thesis submitted in partial fulfillment of the requirements for the degree of Master of Engineering in Geotechnical and Earth Resources Engineering, School of Engineering and Technology

Thesis (M. Eng.) - Asian Institute of Technology, 2013

Mechanized tunneling is always feasible and justified with its boring length and in case of short length tunnels or cross cuts between two tunnels or a non circular tunnels required then the excavation method is to be changed from mechanized to the conventional excavation method. A numerical study is performed for assessment of applicability of sequential tunnel excavation in Bangkok subsoil condition. Three schemes of sequential excavation are investigated using the Mohr Coulomb and the Hardening soil model. Three water pressure conditions in the soil layers are defined to explore the effect on tunneling. The undrained effective stress analysis is performed using effective strength and stiffness parameters. The 2D plane strain model is implemented with consideration of the 3D face effect by stress reduction method. Shotcrete lining is considered with two different stiffness values to incorporate approximate effect of shotcrete aging. The results demonstrate that sequential tunnel excavation is not feasible in Bangkok subsoil. Two mechanisms of failure are found first is failure of soil cover above roof and second is the base heave. However, with improved ground it is possible to excavate the tunnel sequentially. Increase in dimension or strength of improved ground results in reduction in lining loads and surface settlement. Hardening soil model results in narrow and deeper surface settlement troughs if compared to the Mohr Coulomb model result. Water pressure variation results in higher bending moment in lining.

There are no comments on this title.

to post a comment.
คัดลอกแล้ว!