Purchase price of independently produced power : the case of Nepal

By: Call Number: AIT Thesis no.ET-95-07 Contributor(s): Material type: TextSeries: Asian Institute of Technology. Thesis ; no. ET-95-7Publication details: Bangkok : Asian Institute of Technology, 1995Description: 151 leaves + 1 online resourceSubject(s): Online resources: Dissertation note: Thesis (M.Eng.) - Asian Institute of Technology, 1995 Summary: Independent Power Producers (IPPs) are a major source of new power generation capacity both in the industrialized and developing countries. They have a potential to meet large and immediate financing gap by mobilizing direct foreign investment in the power sector. In developing countries IPPs have tapped new forms of financing in international capital markets. Private sector involvement in the power sector has also led to impressive construction and operational efficiency gains. Properly structured IPPs can also stimulate the development of local capital markets. The study undertakes several detailed system expansion plans for the hydro dominated electricity supply sector of Nepal for the period 1996-2015. Wein Automatic System Expansion Planning Model developed by the International Atomic Energy Agency has been used to carryout the system expansion plan with and without the contribution of the IPP. Significant costs of up to 20% of the total cost in the planning horizon was found to be avoided by the utility as a consequence of IPP supply to the grid. A voided costs have been calculated from the long-run marginal cost perspective and adjusted for financial requirements. The avoided costs of 5.05 cents/kWh were found to be 6.48% lower than that required, 5.40 cents/kWh, to provide the required rate of return on equity of 16%, for the IPP under consideration.
Tags from this library: No tags from this library for this title. Log in to add tags.
Star ratings
    Average rating: 0.0 (0 votes)
Holdings
Cover image Item type Current library Home library Collection Shelving location Call number Materials specified Vol info URL Copy number Status Notes Date due Barcode Item holds Item hold queue priority Course reserves
14-General Book Asian Institute of Technology Library AIT Publications AIT Thesis no.ET-95-07 (Browse shelf(Opens below)) 1 Available 30050120677967
20-AIT Publication Asian Institute of Technology Library AIT Publications AIT Thesis no.ET-95-07 (Browse shelf(Opens below)) 2 Available 30050120677975
40-Archives Asian Institute of Technology Library Archives AIT Thesis no.ET-95-07 (Browse shelf(Opens below)) Available 30050120366900

A thesis submitted in partial fulfillment of the requirement for the degree of Masters of Engineering

Thesis (M.Eng.) - Asian Institute of Technology, 1995

Independent Power Producers (IPPs) are a major source of new power generation capacity both in the industrialized and developing countries. They have a potential to meet large and immediate financing gap by mobilizing direct foreign investment in the power sector. In developing countries IPPs have tapped new forms of financing in international capital markets. Private sector involvement in the power sector has also led to impressive construction and operational efficiency gains. Properly structured IPPs can also stimulate the development of local capital markets. The study undertakes several detailed system expansion plans for the hydro dominated electricity supply sector of Nepal for the period 1996-2015. Wein Automatic System Expansion Planning Model developed by the International Atomic Energy Agency has been used to carryout the system expansion plan with and without the contribution of the IPP. Significant costs of up to 20% of the total cost in the planning horizon was found to be avoided by the utility as a consequence of IPP supply to the grid. A voided costs have been calculated from the long-run marginal cost perspective and adjusted for financial requirements. The avoided costs of 5.05 cents/kWh were found to be 6.48% lower than that required, 5.40 cents/kWh, to provide the required rate of return on equity of 16%, for the IPP under consideration.

There are no comments on this title.

to post a comment.
คัดลอกแล้ว!