Queuing analysis applications in construction management

By: Call Number: AIT Thesis no.ST-85-32 Contributor(s): Material type: TextSeries: Asian Institute of Technology. Thesis ; no. ST-85-3Publication details: Bangkok : Asian Institute of Technology, 1985Description: 55 pSubject(s): Online resources: Dissertation note: Thesis (M.Eng.) - Asian Institute of Technology, 1985 Summary: The application of Queuing Theory is examined for field construction operations. Data observed on two construction sites are used to validate the exponential models which are developed in this study for the single-server and multi-server cases. It is found that the exponential models developed in this study approximate, very closely, actual field conditions. Hence it is concluded that these models could effectively be used to estimate production, queue waiting times and queue lengths for construction operations. A hopper model is also developed to enable construction managers to determine at what point hoppers are needed in order to increase production. Charts and tables are developed from the results of this study using the queuing models. These tables and charts are effective for estimating purposes in actual construction operations and are useful for decision making purposed.
Tags from this library: No tags from this library for this title. Log in to add tags.
Star ratings
    Average rating: 0.0 (0 votes)
Holdings
Cover image Item type Current library Home library Collection Shelving location Call number Materials specified Vol info URL Copy number Status Notes Date due Barcode Item holds Item hold queue priority Course reserves
22-AIT Thesis (Replacement) Asian Institute of Technology Library AIT Publications AIT Thesis no.ST-85-32 (Browse shelf(Opens below)) 3 Available 30050120687412
40-Archives Asian Institute of Technology Library Archives AIT Thesis no.ST-85-32 (Browse shelf(Opens below)) 1 Available 30050160012372

A thesis submitted in partial fulfillment of the requirements for the degree of Master of Engineering, School of Engineering and Technology

Thesis (M.Eng.) - Asian Institute of Technology, 1985

The application of Queuing Theory is examined for field construction operations. Data observed on two construction sites are used to validate the exponential models which are developed in this study for the single-server and multi-server cases. It is found that the exponential models developed in this study approximate, very closely, actual field conditions. Hence it is concluded that these models could effectively be used to estimate production, queue waiting times and queue lengths for construction operations. A hopper model is also developed to enable construction managers to determine at what point hoppers are needed in order to increase production. Charts and tables are developed from the results of this study using the queuing models. These tables and charts are effective for estimating purposes in actual construction operations and are useful for decision making purposed.