Rapid application prototyping (RAP) for information system development

By: Call Number: AIT Thesis no. IM-98-15 Contributor(s): Material type: SeriesSeries: Asian Institute of Technology. Thesis ; no. IM-98-15Publication details: Bangkok : Asian Institute of Technology, 1998Description: 60 p. : illSubject(s): Online resources: Dissertation note: Thesis (M.Sc.) - Asian Institute of Technology, 1998 Summary: Information system becomes the enabler for most business process reengineering (BPR) projects. At present, system development in BPR project uses the rapid application prototyping (RAP) approach instead of the system development life cycle (SDLC) approach due to its better speed of delivery time. However, the current RAP approach can be modified to decrease the delivery time. The stages for proposed RAP are divided into five phases: conceptual design, physical design, development, transition, and production. The essence of RAP is in the first three phases because there is iteration in each phase and the changes can be made at any time during these three phases. The development phase can be started during detail design task in physical design phase is going on It can ensure faster delivery time. In each task of system development, it needs the participation of users to confirm deliverables from the project team. It helps final deliverables to contain less errors and changes. This study work is presented via the implementation of the real-world case. Reengineering teams of the organization needs to set up the project team to develop the information system, called the customers' order follow up system (COFS), to satisfy customers' needs. The project team employs the proposed model to develop information system. Finally, the first prototype of the system for COFS is developed and meets the BPR team's requirement.
Tags from this library: No tags from this library for this title. Log in to add tags.
Star ratings
    Average rating: 0.0 (0 votes)
Holdings
Cover image Item type Current library Home library Collection Shelving location Call number Materials specified Vol info URL Copy number Status Notes Date due Barcode Item holds Item hold queue priority Course reserves
20-AIT Publication Asian Institute of Technology Library AIT Publications AIT Thesis no. IM-98-15 (Browse shelf(Opens below)) 1 Available 30050120820161
20-AIT Publication Asian Institute of Technology Library AIT Publications AIT Thesis no. IM-98-15 (Browse shelf(Opens below)) 2 Available 30050120820153
40-Archives Asian Institute of Technology Library Archives AIT Thesis no. IM-98-15 (Browse shelf(Opens below)) 1 Available 30050160074174

A thesis submitted in partial fulfillment of the requirements for the degree of Master of Science, School of Advanced Technologies

Thesis (M.Sc.) - Asian Institute of Technology, 1998

Information system becomes the enabler for most business process reengineering (BPR) projects. At present, system development in BPR project uses the rapid application prototyping (RAP) approach instead of the system development life cycle (SDLC) approach due to its better speed of delivery time. However, the current RAP approach can be modified to decrease the delivery time. The stages for proposed RAP are divided into five phases: conceptual design, physical design, development, transition, and production. The essence of RAP is in the first three phases because there is iteration in each phase and the changes can be made at any time during these three phases. The development phase can be started during detail design task in physical design phase is going on It can ensure faster delivery time. In each task of system development, it needs the participation of users to confirm deliverables from the project team. It helps final deliverables to contain less errors and changes. This study work is presented via the implementation of the real-world case. Reengineering teams of the organization needs to set up the project team to develop the information system, called the customers' order follow up system (COFS), to satisfy customers' needs. The project team employs the proposed model to develop information system. Finally, the first prototype of the system for COFS is developed and meets the BPR team's requirement.

There are no comments on this title.

to post a comment.
คัดลอกแล้ว!