01751nam a2200241 450000500170000000800410001703500150005810000230007324500780009626000520017430000110022649000230023750001620026050200570042252006400047965000470111970000320116670000460119870000480124471000970129281000550138985600650144420260818214045.0170398 th eng  a.b100418741 aBorah, Debi Charan12aA simulation model of earth moving operations for construction management aBangkok :bAsian Institute of Technology,c1977 a107 p.1 aThesis ;vno. 1130 aA thesis submitted in partial fulfillment of the requirements for the degree of Master of Engineering of the Asian Institute of Technology, Bangkok, Thailand aThesis (M.Eng.) - Asian Institute of Technology,1977 aA mathematical simulation model is developed to forecast the operations of earthmoving in construction. A computer programme in Fortran; to handle all the possible different parameters in such as operation is presented. The model is designed to cope with labour intensive operation or capital intensive operation or a combination of both of them. Results of this investigation can be used to predetermine the optimum combination of different units in such an operation for the maximum benefits. A comparison of C.I. and L.I. processes, in respect to costs and time required for the same magnitude of work, is also investigated into. 0aEarthmoving machineryxMathematical models1 aScott, David, eChairperson1 aTanabe, Tada-Aki, eExamination Committee1 aJearkjirm, Vithool, eExamination Committee2 aCarl Duisberg - Gesellschaft e.V. Cologne, Federal Republic of Germany, eScholarship Donor2 aAsian Institute of Technology.tThesis ;vno. 1130 3Full-Textuhttp://203.159.5.9/ait-thesis/detail.php?q=B23196