<?xml version="1.0" encoding="UTF-8"?>
<mods xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xmlns="http://www.loc.gov/mods/v3" version="3.1" xsi:schemaLocation="http://www.loc.gov/mods/v3 http://www.loc.gov/standards/mods/v3/mods-3-1.xsd">
  <titleInfo>
    <nonSort>A </nonSort>
    <title>study of construction contracting system for large projects in Bangkok</title>
  </titleInfo>
  <name type="personal">
    <namePart>Sirada Padmasuta</namePart>
    <role>
      <roleTerm authority="marcrelator" type="text">creator</roleTerm>
    </role>
  </name>
  <name type="personal">
    <namePart>Ping Kunawatsatit</namePart>
    <role>
      <roleTerm type="text">Chairperson</roleTerm>
    </role>
  </name>
  <name type="personal">
    <namePart>Arditi, David</namePart>
    <role>
      <roleTerm type="text">Examination committee</roleTerm>
    </role>
  </name>
  <name type="personal">
    <namePart>Ogunlana, Stephen O.</namePart>
    <role>
      <roleTerm type="text">Examination Committee</roleTerm>
    </role>
  </name>
  <name type="corporate">
    <namePart>Canadian International Development Agency (CIDA)</namePart>
    <role>
      <roleTerm type="text">Scholarship donor </roleTerm>
    </role>
  </name>
  <typeOfResource>text</typeOfResource>
  <originInfo>
    <place>
      <placeTerm type="code" authority="marccountry">th</placeTerm>
    </place>
    <place>
      <placeTerm type="text">Bangkok</placeTerm>
    </place>
    <publisher>Asian Institute of Technology</publisher>
    <dateIssued>1992</dateIssued>
    <issuance>monographic</issuance>
  </originInfo>
  <language>
    <languageTerm authority="iso639-2b" type="code">eng</languageTerm>
  </language>
  <physicalDescription>
    <form authority="marcform">print</form>
    <extent>95, [88] leaves</extent>
  </physicalDescription>
  <abstract>In this thesis, the type of contracts used among each party involved in large  constrnction projects is investigated. Forty-five Bangkok-based constrnction projects is  randomly selected for the data collection through interviews. Types of contract and  details, project organization, project contractual agreement, advantages and disadvantages  of each contract type, relationship between each four main groups involved in I  constrnction works as well as the material purchasing system are studied and concluded  in the first part.  Moreover, the environmental factors which also afftect the construction contracting  system such as the new Value Added Tax system or the shortage of construction materials  especially cement and steels are studied and concluded in the second part.  </abstract>
  <note>A thesis submitted in partial fulfillment of the requirements for the degree of Master of  Engineering, School of Engineering and Technology</note>
  <note>Thesis (M.Eng.) - Asian Institute of Technology, 1992</note>
  <subject authority="lcsh">
    <topic>Construction industry</topic>
    <geographic>Thailand</geographic>
    <geographic>Bangkok</geographic>
    <topic>Management</topic>
  </subject>
  <subject authority="lcsh">
    <topic>Building</topic>
    <topic>Contracts and specifications</topic>
    <geographic>Thailand</geographic>
    <geographic>Bangkok</geographic>
  </subject>
  <relatedItem type="series">
    <titleInfo>
      <title>Thesis ; no. ST-92-16</title>
    </titleInfo>
    <name type="corporate">
      <namePart>Asian Institute of Technology.</namePart>
      <namePart/>
    </name>
  </relatedItem>
  <identifier type="uri">http://203.159.5.9/ait-thesis/detail.php?q=B16914</identifier>
  <location>
    <url displayLabel="Full-Text">http://203.159.5.9/ait-thesis/detail.php?q=B16914</url>
  </location>
  <recordInfo>
    <recordCreationDate encoding="marc">220798</recordCreationDate>
    <recordChangeDate encoding="iso8601">20260818223014.0</recordChangeDate>
  </recordInfo>
</mods>
