A survey of costs and cost escalation in construction activities in Bangkok - Bangkok : Asian Institute of Technology, 1975 - 78 p. - Thesis ; no. 809 . - Asian Institute of Technology. Thesis ; no. 809 .

A thesis submitted in partial fulfillment of the requirements for the degree of Master of Engineering of the Asian Institute of Technology, Bangkok, Thailand.

Thesis (M.Eng.) - Asian Institute of Technology, 1975

This research deals with the study of the effect of cost escalation in construction. Cost coefficients used to find the escalation factors for the activities in the foundation and structural parts of a construction project are analyzed herein from the data gathered in a survey conducted in Bangkok. The study is extended to the analysis of the cash flow of the project and the determination of the financial capital needed by the general contractor in case of cost escalation. This analysis is made easy by the application of the Critical Path Method of planning and scheduling construction projects. For illustration purposes, ·the foundation and structural parts of an engineering construction project of about two years duration are used as examples to show how the algorithm can be applied.


Escalators
Construction industry--Management
Construction industry--Costs