01930nam a2200265 450000500170000000800410001703500150005810000270007324500800010026000520018030000100023249000220024250001630026450200580042752008020048565000150128765000380130265000330134070000350137370000410140870000510144971000450150081000540154585600650159920260818223529.0140198 th eng  a.b1004646x1 aMontecillo, Alfredo P.12aA survey of costs and cost escalation in construction activities in Bangkok aBangkok :bAsian Institute of Technology,c1975 a78 p.1 aThesis ;vno. 809 aA thesis submitted in partial fulfillment of the requirements for the degree of Master of Engineering of the Asian Institute of Technology, Bangkok, Thailand. aThesis (M.Eng.) - Asian Institute of Technology, 1975 aThis research deals with the study of the effect of cost escalation in construction. Cost coefficients used to find the escalation factors for the activities in the foundation and structural parts of a construction project are analyzed herein from the data gathered in a survey conducted in Bangkok. The study is extended to the analysis of the cash flow of the project and the determination of the financial capital needed by the general contractor in case of cost escalation. This analysis is made easy by the application of the Critical Path Method of planning and scheduling construction projects. For illustration purposes, ·the foundation and structural parts of an engineering construction project of about two years duration are used as examples to show how the algorithm can be applied. 0aEscalators 0aConstruction industryxManagement 0aConstruction industryxCosts1 aMorino, Shosuke, eChairperson1 aJearkjirm, Vithool, eCo-Chairperson1 aTongchat Hongladaromp, eExamination Committee2 aJapanese Government, eScholarship Donor2 aAsian Institute of Technology.tThesis ;vno. 809 3Full-Textuhttp://203.159.5.9/ait-thesis/detail.php?q=B24053