<?xml version="1.0" encoding="UTF-8"?>
<mods xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xmlns="http://www.loc.gov/mods/v3" version="3.1" xsi:schemaLocation="http://www.loc.gov/mods/v3 http://www.loc.gov/standards/mods/v3/mods-3-1.xsd">
  <titleInfo>
    <title>Building a learning facility into ACCEST</title>
  </titleInfo>
  <name type="personal">
    <namePart>Huang, Tzu-wei</namePart>
    <role>
      <roleTerm authority="marcrelator" type="text">creator</roleTerm>
    </role>
  </name>
  <name type="personal">
    <namePart>Ogunlana, Stephen O.</namePart>
    <role>
      <roleTerm type="text">Chairperson</roleTerm>
    </role>
  </name>
  <name type="personal">
    <namePart>Chotchai Charoenngam</namePart>
    <role>
      <roleTerm type="text">Examination Committee</roleTerm>
    </role>
  </name>
  <name type="personal">
    <namePart>Terrence Clayton</namePart>
    <role>
      <roleTerm type="text">Examination committee</roleTerm>
    </role>
  </name>
  <name type="corporate">
    <namePart>Ret-Ser Engineering Corporation (Chinese Taipei)</namePart>
    <role>
      <roleTerm type="text">Scholarship Donor</roleTerm>
    </role>
  </name>
  <typeOfResource>text</typeOfResource>
  <genre authority="marc">series</genre>
  <genre authority="marc">technical report</genre>
  <originInfo>
    <place>
      <placeTerm type="code" authority="marccountry">th</placeTerm>
    </place>
    <place>
      <placeTerm type="text">Bangkok</placeTerm>
    </place>
    <publisher>Asian Institute of Technology</publisher>
    <dateIssued>2000</dateIssued>
    <issuance>continuing</issuance>
  </originInfo>
  <language>
    <languageTerm authority="iso639-2b" type="code">eng</languageTerm>
  </language>
  <physicalDescription>
    <extent>87 leaves</extent>
  </physicalDescription>
  <abstract>Leaming from previous performance in estimating cost is the best way to improve estimators' capability. Evidence shows that design estimators are not learning adequately from their previous performance in estimating. This failure to learn is attributable to the absence of a system to regularly monitor their performance. ACCEST (ACCuracy in ESTimating program) is a software program first developed by Ogunlana (1989) in the United Kingdom used initially to analyze the accuracy of design estimates. After previous developers, Yeo (1995), Phongsupatsamit (1997) and Naksomvongkul (1999), the program can be used in different operating systems and the human-machine interface is more friendly. The main function of WinACCEST99 is limited to analyzing accuracy of individual construction costs. Estimators can not learn sufficiently from experience on past projects at the same time. To solve this problem, a learning facility was built into WinACCEST99. Estimators can get the needed historical data and learn from the program. The new version is named WinACCEST99 Plus Leaming Facility.</abstract>
  <note>A thesis submitted in partial fulfillment of the requirements for the degree of Master of Engineering, School of Civil Engineering</note>
  <note>Thesis (M.Eng.) - Asian Institute of Technology, 2000</note>
  <subject authority="lcsh">
    <topic>Building</topic>
    <topic>Estimates</topic>
  </subject>
  <subject authority="lcsh">
    <topic>ACCEST (Computer program)</topic>
  </subject>
  <relatedItem type="series">
    <titleInfo>
      <title>Thesis ; no. ST-00-54</title>
    </titleInfo>
    <name type="corporate">
      <namePart>Asian Institute of Technology.</namePart>
      <namePart/>
    </name>
  </relatedItem>
  <identifier type="uri">http://203.159.5.9/ait-thesis/detail.php?q=B06513</identifier>
  <location>
    <url displayLabel="Full-Text">http://203.159.5.9/ait-thesis/detail.php?q=B06513</url>
  </location>
  <recordInfo>
    <recordCreationDate encoding="marc">290900</recordCreationDate>
    <recordChangeDate encoding="iso8601">20260817171825.0</recordChangeDate>
  </recordInfo>
</mods>
