<?xml version="1.0" encoding="UTF-8"?>
<mods xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xmlns="http://www.loc.gov/mods/v3" version="3.1" xsi:schemaLocation="http://www.loc.gov/mods/v3 http://www.loc.gov/standards/mods/v3/mods-3-1.xsd">
  <titleInfo>
    <nonSort>A </nonSort>
    <title>case study on nxm job shop scheduling problem using heuristic approach</title>
  </titleInfo>
  <name type="personal">
    <namePart>Yuen Poovarawan</namePart>
    <role>
      <roleTerm authority="marcrelator" type="text">creator</roleTerm>
    </role>
  </name>
  <name type="personal">
    <namePart>Sharif, M. N.</namePart>
    <role>
      <roleTerm type="text">Chairperson</roleTerm>
    </role>
  </name>
  <name type="personal">
    <namePart>Pakorn Adulbhan</namePart>
    <role>
      <roleTerm type="text">Examination Committee</roleTerm>
    </role>
  </name>
  <name type="personal">
    <namePart>Techapun Raengkhum</namePart>
    <role>
      <roleTerm type="text">Examintion Committee</roleTerm>
    </role>
  </name>
  <name type="corporate">
    <namePart>Kasetsart University</namePart>
    <role>
      <roleTerm type="text">Scholarship Donor</roleTerm>
    </role>
  </name>
  <typeOfResource>text</typeOfResource>
  <originInfo>
    <place>
      <placeTerm type="code" authority="marccountry">th</placeTerm>
    </place>
    <place>
      <placeTerm type="text">Bangkok</placeTerm>
    </place>
    <publisher>Asian Institute of Technology</publisher>
    <dateIssued>1976</dateIssued>
    <issuance>monographic</issuance>
  </originInfo>
  <language>
    <languageTerm authority="iso639-2b" type="code">eng</languageTerm>
  </language>
  <physicalDescription>
    <form authority="marcform">print</form>
    <extent>77 p.</extent>
  </physicalDescription>
  <abstract>This study describes a heuristic algorithm for seeking a quick  and near optimal solution to the n jobs m machines job shop  scheduling problem in which each job 4as a number of operations to be performed on the specified machines in an ordering which are not the  same for all jobs. The model can handle different machines required sequences including l oops, job precedence structure and start- stop lag. The objective is to minimize the total operation time. The developed heuristic algorithm is an extensions of the heuristic rules of the jobs two machines scheduling problem.  At any instant during the n  operation the m machines problem can be converted into a two machine problem. One of this is the machine under consideration and the other machine represents the rest of the machines required by the job  through the first one. In this study, the model has been applied to solve a real-world problem. The results are observed to be sat is factory. </abstract>
  <note>A thesis submitted in partial fulfillment of the requirements for the degree of Master of Engineering of the Asian Institute of Technology, Bangkok, Thailand</note>
  <note>Thesis (M.Eng.) - Asian Institute of Technology, 1976</note>
  <subject authority="lcsh">
    <topic>Scheduling (Management)</topic>
  </subject>
  <relatedItem type="series">
    <titleInfo>
      <title>Thesis ; no. 1154</title>
    </titleInfo>
    <name type="corporate">
      <namePart>Asian Institute of Technology.</namePart>
      <namePart/>
    </name>
  </relatedItem>
  <identifier type="uri">http://203.159.5.9/ait-thesis/detail.php?q=B23919</identifier>
  <location>
    <url displayLabel="Full-Text">http://203.159.5.9/ait-thesis/detail.php?q=B23919</url>
  </location>
  <recordInfo>
    <recordCreationDate encoding="marc">      </recordCreationDate>
    <recordCreationDate encoding="marc">170398</recordCreationDate>
    <recordChangeDate encoding="iso8601">20260817172256.0</recordChangeDate>
  </recordInfo>
</mods>
