<?xml version="1.0" encoding="UTF-8"?>
<mods xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xmlns="http://www.loc.gov/mods/v3" version="3.1" xsi:schemaLocation="http://www.loc.gov/mods/v3 http://www.loc.gov/standards/mods/v3/mods-3-1.xsd">
  <titleInfo>
    <nonSort>A </nonSort>
    <title>comparative study of algorithms for level scheduling in just-in-time production systems</title>
  </titleInfo>
  <name type="personal">
    <namePart>Medhi, Santanoo</namePart>
    <role>
      <roleTerm authority="marcrelator" type="text">creator</roleTerm>
    </role>
  </name>
  <name type="personal">
    <namePart>Pandey, P. C.</namePart>
    <role>
      <roleTerm type="text">Chairperson</roleTerm>
    </role>
  </name>
  <name type="personal">
    <namePart>Tabucanon, Mario T.</namePart>
    <role>
      <roleTerm type="text">Examination Committee</roleTerm>
    </role>
  </name>
  <name type="personal">
    <namePart>Nagarur, Nagendra N.</namePart>
    <role>
      <roleTerm type="text">Examination Committee</roleTerm>
    </role>
  </name>
  <name type="corporate">
    <namePart>NORAD</namePart>
    <role>
      <roleTerm type="text">Scholarship Donor</roleTerm>
    </role>
  </name>
  <typeOfResource>text</typeOfResource>
  <originInfo>
    <place>
      <placeTerm type="code" authority="marccountry">th</placeTerm>
    </place>
    <place>
      <placeTerm type="text">Bangkok</placeTerm>
    </place>
    <publisher>Asian Institute of Technology</publisher>
    <dateIssued>1994</dateIssued>
    <issuance>monographic</issuance>
  </originInfo>
  <language>
    <languageTerm authority="iso639-2b" type="code">eng</languageTerm>
  </language>
  <physicalDescription>
    <form authority="marcform">print</form>
    <extent>59, A10 leaves</extent>
  </physicalDescription>
  <abstract>This thesis study relates to the one of the major problem in implementing mixed model  assembly line under Just In Time Production System. The problem is to generate a level schedule.  The study is intended to serve the need of comparing the existing procedure under different  assumption so as to improve/design new procedure with more assumption relaxed.  A number of researchers have formulated the problem in a number of different way. A  number of heuristic are also available to this complex mathematical problem. These mathematical  formulations and heuristics are studied in detail here. Using computer program and hypothetically  generated data the existing solution procedures are studied and compared with respect to their  computational requirement and efficiency. The assumption regarding the single level problem is  examined in detail.  A small model with complete object oriented feature is also built. The model consists of  complete independent work centers module working under Just In Time principle which can be  used for building other model. Using this model, the heuristic's assumptions are tested.  A way of using level schedule for the company where these can not be used due to large  set up time and low cycle time is also suggested. </abstract>
  <note>A thesis submitted in partial fulfillment of the requirement for the degree of Master of  Engineering, School of Engineering and Technology</note>
  <note>Thesis (M.Eng.) - Asian Institute of Technology, 1994</note>
  <subject authority="lcsh">
    <topic>Just-in-time systems</topic>
  </subject>
  <relatedItem type="series">
    <titleInfo>
      <title>Thesis ; no. IE-94-28</title>
    </titleInfo>
    <name type="corporate">
      <namePart>Asian Institute of Technology.</namePart>
      <namePart/>
    </name>
  </relatedItem>
  <identifier type="uri">http://203.159.5.9/ait-thesis/detail.php?q=B15422</identifier>
  <location>
    <url displayLabel="Full-Text">http://203.159.5.9/ait-thesis/detail.php?q=B15422</url>
  </location>
  <recordInfo>
    <recordCreationDate encoding="marc">030798</recordCreationDate>
    <recordChangeDate encoding="iso8601">20260817173343.0</recordChangeDate>
  </recordInfo>
</mods>
