<?xml version="1.0" encoding="UTF-8"?>
<mods xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xmlns="http://www.loc.gov/mods/v3" version="3.1" xsi:schemaLocation="http://www.loc.gov/mods/v3 http://www.loc.gov/standards/mods/v3/mods-3-1.xsd">
  <titleInfo>
    <title>Comparison of project management approaches between steel box grinder using launching method and temporary support in bridge project</title>
  </titleInfo>
  <name type="personal">
    <namePart>Thant Zin</namePart>
    <role>
      <roleTerm authority="marcrelator" type="text">creator</roleTerm>
    </role>
  </name>
  <name type="personal">
    <namePart>Hadikusumo, Bonaventura H. W.</namePart>
    <role>
      <roleTerm type="text">Chairperson</roleTerm>
    </role>
  </name>
  <name type="personal">
    <namePart>Chotchai Charoenngam</namePart>
    <role>
      <roleTerm type="text">Examination Committee</roleTerm>
    </role>
  </name>
  <name type="personal">
    <namePart>Wasan Teerajetgul</namePart>
    <role>
      <roleTerm type="text">Examination Committee</roleTerm>
    </role>
  </name>
  <typeOfResource>text</typeOfResource>
  <genre authority="marc">series</genre>
  <genre authority="marc">theses</genre>
  <originInfo>
    <place>
      <placeTerm type="code" authority="marccountry">th</placeTerm>
    </place>
    <place>
      <placeTerm type="text">Pathum Thani, Thailand</placeTerm>
    </place>
    <publisher>Asian Institute of Technology</publisher>
    <dateIssued>2020</dateIssued>
    <issuance>continuing</issuance>
  </originInfo>
  <language>
    <languageTerm authority="iso639-2b" type="code">eng</languageTerm>
  </language>
  <physicalDescription>
    <form authority="marcform">print</form>
    <extent>145 leaves : ill. + 1 online resource</extent>
  </physicalDescription>
  <abstract>Nowadays, Myanmar is on the way to democracy economic system. It is the first  priority to promote country{u2019}s economic development. Then, basic infrastructure like  road and bridge, railways, waterway, electricity, telecommunication, water supply,  financial institution, ect are needed a lot to be constructed as it can carry out the  economic activities and which help in economic development of the country. Not only  new infrastructure to be built but also old infrastructure have to be repaired and  upgraded. For road and bridge infrastructure which is under the ministry of  construction. The government has allocated sufficient budget for both new building and  system upgrading to fulfill the increasing infrastructure requirement. For public  infrastructure project, mostly it is implemented base on annual budget, and it has both  budget and time constraint. Therefore, it is a big challenge to complete the project  within budget limitation and defined period. A suitable construction method could be  used during the execution of a construction project to reduce construction time and cost.   This report proposes two difference construction methods like launching method and  temporary support method used in the bridge project. Analysis has carried out to find  out key aspect in term of project management and it can help to improve the selection  of construction methods for a bridge. </abstract>
  <note>A project submitted in partial fulfillment of the requirements for the degree of Master of Engineering (Professional) in Construction Engineering and Infrastructure Management</note>
  <note>Project (M. Eng.) - Asian Institute of Technology, 2020</note>
  <subject authority="lcsh">
    <topic>Project management</topic>
    <geographic>Myanmar</geographic>
  </subject>
  <subject authority="lcsh">
    <topic>Bridges</topic>
    <topic>Design and construction</topic>
    <geographic>Myanmar</geographic>
  </subject>
  <relatedItem type="series">
    <titleInfo>
      <title>Project ; no. MPM-MM-CM-20-05</title>
    </titleInfo>
    <name type="corporate">
      <namePart>Asian Institute of Technology.</namePart>
      <namePart/>
    </name>
  </relatedItem>
  <identifier type="uri">http://203.159.5.9/ait-thesis/detail.php?q=B23814</identifier>
  <location>
    <url displayLabel="Full-Text">http://203.159.5.9/ait-thesis/detail.php?q=B23814</url>
  </location>
  <recordInfo>
    <recordCreationDate encoding="marc">260319</recordCreationDate>
    <recordChangeDate encoding="iso8601">20260818084319.0</recordChangeDate>
  </recordInfo>
</mods>
