<?xml version="1.0" encoding="UTF-8"?>
<mods xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xmlns="http://www.loc.gov/mods/v3" version="3.1" xsi:schemaLocation="http://www.loc.gov/mods/v3 http://www.loc.gov/standards/mods/v3/mods-3-1.xsd">
  <titleInfo>
    <title>Construction material management for Eastern Seaboard Project</title>
  </titleInfo>
  <name type="personal">
    <namePart>Pornchai Prasart-intara</namePart>
    <role>
      <roleTerm authority="marcrelator" type="text">creator</roleTerm>
    </role>
  </name>
  <name type="personal">
    <namePart>Pichai Nimityongskul</namePart>
    <role>
      <roleTerm type="text">Chairperson</roleTerm>
    </role>
  </name>
  <name type="personal">
    <namePart>Ping Kunawatsatit</namePart>
    <role>
      <roleTerm type="text">Co-Chairpeson</roleTerm>
    </role>
  </name>
  <name type="personal">
    <namePart>Pama, Ricardo P.</namePart>
    <role>
      <roleTerm type="text">Examination Committee</roleTerm>
    </role>
  </name>
  <name type="personal">
    <namePart>Chauhan, Gopal</namePart>
    <role>
      <roleTerm type="text">Examination Committee</roleTerm>
    </role>
  </name>
  <name type="corporate">
    <namePart>Government of Denmark</namePart>
    <role>
      <roleTerm type="text">Scholarship Donor</roleTerm>
    </role>
  </name>
  <typeOfResource>text</typeOfResource>
  <originInfo>
    <place>
      <placeTerm type="code" authority="marccountry">th</placeTerm>
    </place>
    <place>
      <placeTerm type="text">Bangkok</placeTerm>
    </place>
    <publisher>Asian Institute of Technology</publisher>
    <dateIssued>1986</dateIssued>
    <issuance>monographic</issuance>
  </originInfo>
  <language>
    <languageTerm authority="iso639-2b" type="code">eng</languageTerm>
  </language>
  <physicalDescription>
    <form authority="marcform">print</form>
    <extent>153 p.</extent>
  </physicalDescription>
  <abstract>This study examines and analyzes the optimal planning and  scheduling of construction materials under non-stationary demand  for the Eastern Seaboard Project in the eastern part of Thailand.  Th ere is a known demand requirement to be met in each period from  the quantity breakdown of project. Algorithms for finding the  optimal policy are under the assumption that all costs are described  by linear function . Substantially , the optimal material delivery  schedule , associated levels of inventory, employment in the  procurement a nd delivery processes, and provided storage space for  the period under analysis are determined by using the application of  integer linear programming model. For this study, the investigation  of locally available satisfactory construction material sources for  the project has to be taken in to consideration so that an economic  hauling distance can be attained, Material cost of these sources  has also to be considered.</abstract>
  <note>A thesis study submitted in partial fulfillment of the requirements for the degree of Master of Engineering, School of Engineering and Technology</note>
  <note>Thesis (M.Eng.) - Asian Institute of Technology, 1986</note>
  <subject authority="lcsh">
    <topic>Eastern Seaboard Project</topic>
  </subject>
  <subject authority="lcsh">
    <topic>Building materials</topic>
    <topic>Research</topic>
  </subject>
  <relatedItem type="series">
    <titleInfo>
      <title>Thesis ; no. ST-86-19</title>
    </titleInfo>
    <name type="corporate">
      <namePart>Asian Institute of Technology.</namePart>
      <namePart/>
    </name>
  </relatedItem>
  <identifier type="uri">http://203.159.5.9/ait-thesis/detail.php?q=B19754</identifier>
  <location>
    <url displayLabel="Full-Text">http://203.159.5.9/ait-thesis/detail.php?q=B19754</url>
  </location>
  <recordInfo>
    <recordCreationDate encoding="marc">310798</recordCreationDate>
    <recordChangeDate encoding="iso8601">20260818084917.0</recordChangeDate>
  </recordInfo>
</mods>
